Catalogue / Mobile substations

No photo yet

Trailer-mounted mobile substation, Smart seriesSample

by Nilgirispark Transformer Works (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Nilgirispark Transformer Works (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Nilgirispark Smart trailer-mounted mobile substation, offered in 4 transformer rating options from 10 MVA to 50 MVA. Design: quick restoration after transformer failure, all protection in a control cabin and compact oil spill containment. Suited to temporary construction power, event power supply and discom emergency backup. Designed and tested to IEC 62271-202, IS 2026 and IEC 60076. Lead time 30-40 weeks; delivers to All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Nilgirispark
Model
NIL-032 series
Listing type
Product
Unit
nos
Minimum order
5 nos
Lead time
30-40 weeks
Warranty
24 months
Standards
IEC 62271-202, IS 2026, IEC 60076
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India (imported sub-assemblies)
Packaging
Corrugated box on pallet
Delivery terms
Ex-works, freight extra at actuals
Returns
No returns on made-to-order items
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Transformer rating10 MVANIL-032-01Transformer rating: 10 MVA5 nos · 30-40 weekson quote
Transformer rating20 MVANIL-032-02Transformer rating: 20 MVA5 nos · 30-40 weekson quote
Transformer rating31.5 MVANIL-032-03Transformer rating: 31.5 MVA5 nos · 30-40 weekson quote
Transformer rating50 MVANIL-032-04Transformer rating: 50 MVA5 nos · 30-40 weekson quote

Specifications

Transformer rating10 MVA to 50 MVA (see variants)
Primary voltage220 kV
Secondary voltage33 kV
ChassisContainer
Primary switchgearAIS disconnector and breaker
Secondary switchgearIndoor VCB panel
Control and relayNumerical relays
Fire protectionDetection and extinguisher
Auxiliary supplyDC battery + DG
Transport weightUp to 45 t
Setup time< 4 hoursmade to order: < 24 hours
GroundingMobile earthing kit
Cable reelIncluded

BARREL: Bharat Atom Renewable Resources Energy Limited