Catalogue / Solar & wind BoP construction
Solar BoP construction (cables, earthing, inverter stations), Ultra 4 seriesSample
by Nilgiri Technical Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Nilgiri Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Solar BoP construction (cables, earthing, inverter stations) from Nilgiri, Ultra 4 series: 3 project size options between 10 MW and 50 MW. Design: trench depth and sand bedding as per standard, compliance with site safety plan and material reconciliation weekly. Used by EPC contractors subcontracting BoP, wind-solar hybrid parks and IPPs managing multiple packages. Delivered in line with IS 7098 (XLPE Cables), IEC 62548 and IS 3043 (Earthing). Mobilisation Mobilisation in 14 days; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Nilgiri
- Model
- NIL-F34 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Mobilisation in 14 days
- Warranty
- Workmanship 12 months
- Standards
- IS 7098 (XLPE Cables), IEC 62548, IS 3043 (Earthing)
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Project size10 MWNIL-F34-01 | Project size: 10 MW | 1 MW · Mobilisation in 14 days | on quote |
| Project size25 MWNIL-F34-02 | Project size: 25 MW | 1 MW · Mobilisation in 14 days | on quote |
| Project size50 MWNIL-F34-03 | Project size: 50 MW | 1 MW · Mobilisation in 14 days | on quote |
Specifications
| Project size | 10 MW to 50 MW (see variants) |
|---|---|
| Scope | Cabling and earthingmade to order: Civil plus electrical BoP / Complete BoP except modules |
| DC cables | 6 sq mm solar cablemade to order: 4 sq mm solar cable |
| MV cables | 33 kV XLPE Cumade to order: 33 kV XLPE Al armoured |
| Inverter station | Brick built roommade to order: Skid or containerised |
| Lightning protection | ESE system |
| Crew size | 80 personsmade to order: 150 persons / 300 persons |
| Equipment | Trenchers, cranes, excavators |
| Quality | QAP with stage inspection |
| Duration | 6-9 months |
| Payment | Milestone basedmade to order: Monthly measured bills |