Catalogue / Engineering & design

No photo yet

Detailed engineering for solar PV plants, Plus 2 seriesSample

by Nilgiri Technical Services (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Nilgiri Technical Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Nilgiri Plus 2 detailed engineering for solar PV plants, offered in 4 plant capacity options from 5 MW to 50 MW. Key features: cable sizing and voltage drop calculations, compliant with state grid code requirements and layout optimisation for land and shading. Suited to EPC contractors bidding for projects, captive and C&I solar owners and IPPs and developers. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, IEC 62548 and IS 3043 (Earthing). Mobilisation 3-4 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Nilgiri
Model
NIL-774 series
Listing type
Service
Unit
job
Minimum order
1 job
Lead time
3-4 weeks
Warranty
As per contract
Standards
CEA (Technical Standards for Connectivity) Regulations, IEC 62548, IS 3043 (Earthing)
Delivers to
All India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Plant capacity5 MWNIL-774-01Plant capacity: 5 MW1 job · 3-4 weekson quote
Plant capacity10 MWNIL-774-02Plant capacity: 10 MW1 job · 3-4 weekson quote
Plant capacity25 MWNIL-774-03Plant capacity: 25 MW1 job · 6-10 weekson quote
Plant capacity50 MWNIL-774-04Plant capacity: 50 MW1 job · 6-10 weekson quote

Specifications

Plant capacity5 MW to 50 MW (see variants)
DeliverablesGA drawings, SLD, BoQmade to order: Full IFC drawing set with calculations / Design basis report plus drawings
Design softwarePVsyst, AutoCAD, ETAP
TeamElectrical, civil and SCADA discipline leads
Turnaround6-8 weeks
Revisions includedUnlimited until approvalmade to order: 2 rounds / 3 rounds
Authority submission supportCEA/CEIG drawing approval
Earthing and LA studyIncludedmade to order: Optional add-on
FormatPDF, CAD and BIM modelmade to order: PDF and native CAD
Site visitDesk design onlymade to order: One visit included / Two visits included
Payment milestones50% advance, 50% on delivery

BARREL: Bharat Atom Renewable Resources Energy Limited