Catalogue / Project management (PMC) & owner's engineer
Owner's engineer for EPC supervision, Core 2 seriesSample
by Nilgiri Technical Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Nilgiri Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Core 2 service of owner's engineer for EPC supervision by Nilgiri covers 3 project size options (25 MW to 100 MW). Highlights: safety compliance audits, lender-ready reporting and independent view on contractor claims. Typically used for infrastructure funds, PSU and government implementing agencies and lender-monitored projects. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, IS 14489 (Safety Audit) and FIDIC conditions of contract. Mobilisation Deployment in 2 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Nilgiri
- Model
- NIL-C05 series
- Listing type
- Service
- Unit
- month
- Minimum order
- 1 month
- Lead time
- Deployment in 2 weeks
- Warranty
- As per contract
- Standards
- CEA (Technical Standards for Connectivity) Regulations, IS 14489 (Safety Audit), FIDIC conditions of contract
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Project size25 MWNIL-C05-01 | Project size: 25 MW | 1 month · Deployment in 2 weeks | on quote |
| Project size50 MWNIL-C05-02 | Project size: 50 MW | 1 month · Deployment in 2 weeks | on quote |
| Project size100 MWNIL-C05-03 | Project size: 100 MW | 1 month · Deployment in 2 weeks | on quote |
Specifications
| Project size | 25 MW to 100 MW (see variants) |
|---|---|
| Scope | Owner's engineer through CODmade to order: Design review and QA/QC / Full PMC with contract management |
| Team on site | PM, 3 engineers, QA/QC inspector |
| Schedule control | MS Project weeklymade to order: Primavera P6 baseline and updates |
| Reporting | Monthly dashboard for lenders |
| Inspection | Material inspection at vendor worksmade to order: Stage-wise inspection at site |
| Billing verification | Certificate for each running billmade to order: Quantity and rate audit |
| Claims support | Not includedmade to order: EOT and variation assessment |
| Duration | 6 monthsmade to order: 12 months / 18-24 months |
| Interface management | With lender engineermade to order: Between EPC, DISCOM and STU |
| Handover | Closure report, punch list, as-builts |