Catalogue / Cabling, trenching & HDD works

No photo yet

Duct bank and conduit installation, Plus seriesSample

by Nilgiri Technical Services (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Nilgiri Technical Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Duct bank and conduit installation from Nilgiri, Plus series: 5 cable route length options between 2 km and 50 km. Key features: utility locating before excavation, warning tape and marker installation and traffic management at crossings. Suited to renewable plant internal networks, urban distribution upgrades and industrial plant cabling. Delivered in line with IS 1255 (Cable Installation), IS 7098 (XLPE Cables) and IEC 60840. Mobilisation Mobilisation in 7 days; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Nilgiri
Model
NIL-C16 series
Listing type
Service
Unit
km
Minimum order
1 km
Lead time
Mobilisation in 7 days
Warranty
Workmanship 12 months
Standards
IS 1255 (Cable Installation), IS 7098 (XLPE Cables), IEC 60840
Delivers to
All India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Cable route length2 kmNIL-C16-01Cable route length: 2 km1 km · Mobilisation in 7 daysfor verified buyers
Cable route length5 kmNIL-C16-02Cable route length: 5 km1 km · Mobilisation in 7 daysfor verified buyers
Cable route length10 kmNIL-C16-03Cable route length: 10 km1 km · Mobilisation in 7 daysfor verified buyers
Cable route length20 kmNIL-C16-04Cable route length: 20 km1 km · Permits may extend timelinefor verified buyers
Cable route length50 kmNIL-C16-05Cable route length: 50 km1 km · Permits may extend timelinefor verified buyers

Specifications

Cable route length2 km to 50 km (see variants)
MethodTrench plus HDD for crossingsmade to order: Open trench / Trenchless HDD
HDD capacityUp to 450 mm boremade to order: Up to 250 mm bore
Trench depth0.9 mmade to order: 1.2 m / 1.5 m
Cable typeLT armouredmade to order: 11/33 kV XLPE
JointingHeat shrinkmade to order: Cold shrink / Premoulded
RestorationBackfill and compaction onlymade to order: Road and footpath restoration
PermissionsContractor arranges road cut approvals
TestingInsulation and VLF test
Productivity300 m per day open trench
CrewTrenching team of 15

BARREL: Bharat Atom Renewable Resources Energy Limited