Catalogue / Civil & foundation works

No photo yet

Pile foundations for module mounting structures, Max seriesSample

by Nilgiri Technical Services (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Nilgiri Technical Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Nilgiri Max pile foundations for module mounting structures, offered in 5 works volume options from 5 MW equivalent to 100 MW equivalent. Key features: cube and pile test records, local labour employed where possible and monsoon-ready drainage planning. Typically used for solar parks, substations and control rooms and industrial plants. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation 4-12 weeks execution; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Nilgiri
Model
NIL-1C9 series
Listing type
Service
Unit
job
Minimum order
1 job
Lead time
4-12 weeks execution
Warranty
Pile load test certified
Standards
IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
Delivers to
All India
GST rate
18 %
Country of origin
India (imported sub-assemblies)
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Works volume5 MW equivalentNIL-1C9-01Works volume: 5 MW equivalent1 job · 4-12 weeks executionon quote
Works volume10 MW equivalentNIL-1C9-02Works volume: 10 MW equivalent1 job · 4-12 weeks executionon quote
Works volume25 MW equivalentNIL-1C9-03Works volume: 25 MW equivalent1 job · 4-12 weeks executionon quote
Works volume50 MW equivalentNIL-1C9-04Works volume: 50 MW equivalent1 job · 4-12 weeks executionon quote
Works volume100 MW equivalentNIL-1C9-05Works volume: 100 MW equivalent1 job · 4-12 weeks executionon quote

Specifications

Works volume5 MW equivalent to 100 MW equivalent (see variants)
Foundation typeDriven steel pile
Concrete gradeM40 for turbine foundationmade to order: M25 / M30
Pull-out testing2% piles tested
ReinforcementFe 500D TMT
Roads and drainageMurram road, 4 m wide
BoundaryChain link fence 2.4 mmade to order: Compound wall with barbed wire
QualityNABL lab testing of materials
MachineryPiling rigs and excavatorsmade to order: Batching plant at site
Duration3-6 months
Payment termsItem rate with retentionmade to order: Measured running bills

BARREL: Bharat Atom Renewable Resources Energy Limited