Catalogue / Resource assessment (solar, wind, hydro)

No photo yet

Wind resource assessment with met mast, Flex 6 seriesSample

by Nilgiritesla Engineering Services (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Nilgiritesla Engineering Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

The Flex 6 service of wind resource assessment with met mast by Nilgiritesla covers 6 measurement duration options (Desktop study to 24 months). Key features: long-term correction using reference data, independent bankable estimate and extreme wind and wake studies. Suited to wind and solar developers, hybrid project planners and state agencies mapping resource. Delivered in line with IEC 61400-12-1, IEC 61724-1 and IEC 61400-15. Mobilisation Desktop in 2-3 weeks; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Nilgiritesla
Model
NIL-CB4 series
Listing type
Service
Unit
report
Minimum order
1 report
Lead time
Desktop in 2-3 weeks
Warranty
Data availability guarantee above 95%
Standards
IEC 61400-12-1, IEC 61724-1, IEC 61400-15
Delivers to
East & North-East India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Measurement durationDesktop studyNIL-CB4-01Measurement duration: Desktop study1 report · Desktop in 2-3 weeksfor verified buyers
Measurement duration3 monthsNIL-CB4-02Measurement duration: 3 months1 report · Desktop in 2-3 weeksfor verified buyers
Measurement duration6 monthsNIL-CB4-03Measurement duration: 6 months1 report · Desktop in 2-3 weeksfor verified buyers
Measurement duration12 monthsNIL-CB4-04Measurement duration: 12 months1 report · Desktop in 2-3 weeksfor verified buyers
Measurement duration18 monthsNIL-CB4-05Measurement duration: 18 months1 report · Campaign 3-24 monthsfor verified buyers
Measurement duration24 monthsNIL-CB4-06Measurement duration: 24 months1 report · Campaign 3-24 monthsfor verified buyers

Specifications

Measurement durationDesktop study to 24 months (see variants)
TechnologySmall hydromade to order: Solar GHI/DNI / Wind
Data sourceHybrid with MCPmade to order: Satellite and reanalysis / On-site measurement
EquipmentClass A pyranometer station
UncertaintyBankable assessment
ModellingWAsP, WindPROmade to order: PVsyst, SAM
DeliverableResource report
CalibrationCalibration pre and post campaignmade to order: Traceable calibration
Site countMulti-site comparisonmade to order: Single site
MaintenanceQuarterly site visit
TurnaroundReport in 3 weeks

BARREL: Bharat Atom Renewable Resources Energy Limited