Catalogue / Resource assessment (solar, wind, hydro)
Wind resource assessment with met mast, Flex 6 seriesSample
by Nilgiritesla Engineering Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Nilgiritesla Engineering Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Flex 6 service of wind resource assessment with met mast by Nilgiritesla covers 6 measurement duration options (Desktop study to 24 months). Key features: long-term correction using reference data, independent bankable estimate and extreme wind and wake studies. Suited to wind and solar developers, hybrid project planners and state agencies mapping resource. Delivered in line with IEC 61400-12-1, IEC 61724-1 and IEC 61400-15. Mobilisation Desktop in 2-3 weeks; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Nilgiritesla
- Model
- NIL-CB4 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- Desktop in 2-3 weeks
- Warranty
- Data availability guarantee above 95%
- Standards
- IEC 61400-12-1, IEC 61724-1, IEC 61400-15
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Measurement durationDesktop studyNIL-CB4-01 | Measurement duration: Desktop study | 1 report · Desktop in 2-3 weeks | for verified buyers |
| Measurement duration3 monthsNIL-CB4-02 | Measurement duration: 3 months | 1 report · Desktop in 2-3 weeks | for verified buyers |
| Measurement duration6 monthsNIL-CB4-03 | Measurement duration: 6 months | 1 report · Desktop in 2-3 weeks | for verified buyers |
| Measurement duration12 monthsNIL-CB4-04 | Measurement duration: 12 months | 1 report · Desktop in 2-3 weeks | for verified buyers |
| Measurement duration18 monthsNIL-CB4-05 | Measurement duration: 18 months | 1 report · Campaign 3-24 months | for verified buyers |
| Measurement duration24 monthsNIL-CB4-06 | Measurement duration: 24 months | 1 report · Campaign 3-24 months | for verified buyers |
Specifications
| Measurement duration | Desktop study to 24 months (see variants) |
|---|---|
| Technology | Small hydromade to order: Solar GHI/DNI / Wind |
| Data source | Hybrid with MCPmade to order: Satellite and reanalysis / On-site measurement |
| Equipment | Class A pyranometer station |
| Uncertainty | Bankable assessment |
| Modelling | WAsP, WindPROmade to order: PVsyst, SAM |
| Deliverable | Resource report |
| Calibration | Calibration pre and post campaignmade to order: Traceable calibration |
| Site count | Multi-site comparisonmade to order: Single site |
| Maintenance | Quarterly site visit |
| Turnaround | Report in 3 weeks |