Catalogue / Grid connectivity & GNA applications
Evacuation approval for solar and wind parks, Duo 9 seriesSample
by Nilgiritesla Engineering Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Nilgiritesla Engineering Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Nilgiritesla Duo 9 evacuation approval for solar and wind parks, offered in 3 capacity applied options from 10 MW to 100 MW. Design: bank guarantee timeline tracking, eligibility check before filing and handling of CTU queries. Suited to renewable developers, industrial captive generators and green hydrogen projects. Delivered in line with CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations and Indian Electricity Grid Code. Mobilisation Filing in 1-2 weeks; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Nilgiritesla
- Model
- NIL-F36 series
- Listing type
- Service
- Unit
- application
- Minimum order
- 1 application
- Lead time
- Filing in 1-2 weeks
- Warranty
- As per contract
- Standards
- CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Capacity applied10 MWNIL-F36-01 | Capacity applied: 10 MW | 1 application · Filing in 1-2 weeks | for verified buyers |
| Capacity applied50 MWNIL-F36-02 | Capacity applied: 50 MW | 1 application · Filing in 1-2 weeks | for verified buyers |
| Capacity applied100 MWNIL-F36-03 | Capacity applied: 100 MW | 1 application · Filing in 1-2 weeks | for verified buyers |
Specifications
| Capacity applied | 10 MW to 100 MW (see variants) |
|---|---|
| Application | GNAmade to order: Connectivity / Both |
| Scope | End-to-end liaisonmade to order: Document preparation and filing |
| Bank guarantee | Arranged through partner bank |
| Studies | Detailed power system study |
| Portal handling | CTUIL portal |
| Team | Regulatory lead and engineer |
| Timeline | Approval 3-6 monthsmade to order: Filing in 2 weeks |
| Technical documents | SLD, land proof, board resolution |
| Queries | Until grant |
| Fee basis | Fixed plus success |