Catalogue / Grid connectivity & GNA applications
Connectivity application to STU, Elite 7 seriesSample
by Nilgiritesla Engineering Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Nilgiritesla Engineering Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Connectivity application to STU from Nilgiritesla, Elite 7 series: 5 capacity applied options between 50 MW and 1000 MW. Highlights: preparation of mandatory technical details, bank guarantee timeline tracking and eligibility check before filing. Suited to renewable developers, green hydrogen projects and industrial captive generators. Delivered in line with CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations and Indian Electricity Grid Code. Mobilisation Filing in 1-2 weeks; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Nilgiritesla
- Model
- NIL-668 series
- Listing type
- Service
- Unit
- application
- Minimum order
- 1 application
- Lead time
- Filing in 1-2 weeks
- Warranty
- As per contract
- Standards
- CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Capacity applied50 MWNIL-668-01 | Capacity applied: 50 MW | 1 application · Filing in 1-2 weeks | for verified buyers |
| Capacity applied100 MWNIL-668-02 | Capacity applied: 100 MW | 1 application · Filing in 1-2 weeks | for verified buyers |
| Capacity applied250 MWNIL-668-03 | Capacity applied: 250 MW | 1 application · Filing in 1-2 weeks | for verified buyers |
| Capacity applied500 MWNIL-668-04 | Capacity applied: 500 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied1000 MWNIL-668-05 | Capacity applied: 1000 MW | 1 application · Grant 3-9 months | for verified buyers |
Specifications
| Capacity applied | 50 MW to 1000 MW (see variants) |
|---|---|
| Application | GNAmade to order: Connectivity / Both |
| Scope | Document preparation and filingmade to order: End-to-end liaison |
| Bank guarantee | Arranged by client |
| Studies | Detailed power system studymade to order: Grid impact summary |
| Portal handling | STU portalmade to order: CTUIL portal |
| Team | Dedicated manager |
| Timeline | Filing in 2 weeks |
| Technical documents | SLD, land proof, board resolution |
| Queries | Until grant |
| Fee basis | Fixed |