Catalogue / Induction & arc furnaces
Submerged electric arc furnace, Eco 5 seriesSample
by Nilgiriurja Furnaces (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Nilgiriurja Furnaces (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Eco 5 range of submerged electric arc furnace by Nilgiriurja covers 6 furnace capacity options (500 kg to 25 MT). Key features: melt-down sequence PLC, waste heat recovery option and thyristor or IGBT power supply with soft start. Used by ferro-alloys, rolling mill billet makers and copper and brass. Designed and tested to IS 3043, IEC 60519-3 and IEC 60519-6. Lead time 20-30 weeks; delivers to West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Nilgiriurja
- Model
- NIL-F11 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 5 nos
- Lead time
- 20-30 weeks
- Warranty
- 12 months
- Standards
- IS 3043, IEC 60519-3, IEC 60519-6
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Steel skid with shrink wrap
- Delivery terms
- Door delivery in metro cities
- Returns
- Replacement of items damaged in transit within 7 days
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Furnace capacity500 kgNIL-F11-01 | Furnace capacity: 500 kg | 5 nos · 20-30 weeks | for verified buyers |
| Furnace capacity1 MTNIL-F11-02 | Furnace capacity: 1 MT | 5 nos · 20-30 weeks | for verified buyers |
| Furnace capacity3 MTNIL-F11-03 | Furnace capacity: 3 MT | 5 nos · 20-30 weeks | for verified buyers |
| Furnace capacity6 MTNIL-F11-04 | Furnace capacity: 6 MT | 5 nos · 20-30 weeks | for verified buyers |
| Furnace capacity12 MTNIL-F11-05 | Furnace capacity: 12 MT | 5 nos · 20-30 weeks | for verified buyers |
| Furnace capacity25 MTNIL-F11-06 | Furnace capacity: 25 MT | 5 nos · 20-30 weeks | for verified buyers |
Specifications
| Furnace capacity | 500 kg to 25 MT (see variants) |
|---|---|
| Type | Electric arcmade to order: Coreless induction / Channel induction / Submerged arc |
| Power supply | 4 MW |
| Frequency | 250 Hzmade to order: 500 Hz / 1000 Hz |
| Charge material | DRI/HBI |
| Melt time per heat | 45 min |
| Specific energy | 560-620 kWh/MTmade to order: 380-420 kWh/MT |
| Cooling | Closed-loop water circuit |
| Tilting | Hydraulic |
| Lining | Acid ramming massmade to order: Neutral lining |
| Power factor | 0.95 with capacitor bank |
| Dust extraction | Fume hood and bag filter |