Ojasline Eco pile foundations for module mounting structures, offered in 6 works volume options from 1 MW equivalent to 100 MW equivalent. Design: waterproofing for cable trenches, cube and pile test records and monsoon-ready drainage planning. Typically used for substations and control rooms, solar parks and industrial plants. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation 4-12 weeks execution; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Ojasline
Model
OJA-1C9 series
Listing type
Service
Unit
job
Minimum order
1 job
Lead time
4-12 weeks execution
Warranty
Structural defect liability 24 months
Standards
IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
Delivers to
All India
GST rate
18 %
Country of origin
India (imported sub-assemblies)
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Works volume1 MW equivalentOJA-1C9-01Works volume: 1 MW equivalent1 job · 4-12 weeks executionon quote
Works volume5 MW equivalentOJA-1C9-02Works volume: 5 MW equivalent1 job · 4-12 weeks executionon quote
Works volume10 MW equivalentOJA-1C9-03Works volume: 10 MW equivalent1 job · 4-12 weeks executionon quote
Works volume25 MW equivalentOJA-1C9-04Works volume: 25 MW equivalent1 job · 4-12 weeks executionon quote
Works volume50 MW equivalentOJA-1C9-05Works volume: 50 MW equivalent1 job · 4-12 weeks executionon quote
Works volume100 MW equivalentOJA-1C9-06Works volume: 100 MW equivalent1 job · 4-12 weeks executionon quote

Specifications

Works volume1 MW equivalent to 100 MW equivalent (see variants)
Foundation typeRamming or screw pilemade to order: Driven steel pile / RCC bored pile / Raft or isolated footing
Concrete gradeM25made to order: M30 / M40 for turbine foundation
Pull-out testingRandom test plus lateral load
ReinforcementFe 550Dmade to order: Fe 500D TMT
Roads and drainageWBM road with culvertsmade to order: Murram road, 4 m wide / Not included
BoundaryChain link fence 2.4 m
QualityNABL lab testing of materialsmade to order: Cube test reports per pour
MachineryPiling rigs and excavators
Duration3-6 monthsmade to order: 4-8 weeks
Payment termsMeasured running billsmade to order: Item rate with retention