Catalogue / Testing & commissioning
Substation commissioning with CEIG inspection, Duo 3 seriesSample
by Ojasline Projects (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Ojasline Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Ojasline Duo 3 substation commissioning with CEIG inspection, offered in 6 plant capacity options from 5 MW to 250 MW. Key features: punch list tracked to closure, live relay setting verification and thermography of terminations before charging. Suited to DISCOM and STU charging, repowering projects and lender completion tests. Delivered in line with IEC 62446-1, IEC 61724-1 and CEA (Technical Standards for Connectivity) Regulations. Mobilisation 1-2 weeks on site; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Ojasline
- Model
- OJA-B97 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- 1-2 weeks on site
- Warranty
- As per contract
- Standards
- IEC 62446-1, IEC 61724-1, CEA (Technical Standards for Connectivity) Regulations
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Plant capacity5 MWOJA-B97-01 | Plant capacity: 5 MW | 1 MW · 1-2 weeks on site | for verified buyers |
| Plant capacity10 MWOJA-B97-02 | Plant capacity: 10 MW | 1 MW · 1-2 weeks on site | for verified buyers |
| Plant capacity25 MWOJA-B97-03 | Plant capacity: 25 MW | 1 MW · 1-2 weeks on site | for verified buyers |
| Plant capacity50 MWOJA-B97-04 | Plant capacity: 50 MW | 1 MW · 1-2 weeks on site | for verified buyers |
| Plant capacity100 MWOJA-B97-05 | Plant capacity: 100 MW | 1 MW · Report in 7 days | for verified buyers |
| Plant capacity250 MWOJA-B97-06 | Plant capacity: 250 MW | 1 MW · Report in 7 days | for verified buyers |
Specifications
| Plant capacity | 5 MW to 250 MW (see variants) |
|---|---|
| Tests covered | Full plant functional and PR testmade to order: String IV curve, insulation, earth / Transformer, switchgear, relay tests |
| Instruments | Relay test set, thermal cameramade to order: Calibrated IV tracer, megger, CRM |
| Calibration | NABL traceable certificates |
| Team | Commissioning engineer plus 2 testers |
| Statutory support | CEIG inspection coordinationmade to order: DISCOM charging support |
| Reports | Commissioning dossier with as-builtmade to order: Test reports with signed formats |
| Duration on site | 5-7 daysmade to order: 10-14 days / 3-4 weeks |
| Performance guarantee test | Capacity and PR test per contract |
| Grid code checks | Not includedmade to order: Reactive power and ramp rate |
| Payment | Milestone on energisation |