Catalogue / Power system studies (load flow, short circuit, grid code)
Dynamic stability and fault ride-through study, Smart seriesSample
by Pallava Engineering Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Pallava Engineering Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Dynamic stability and fault ride-through study from Pallava, Smart series: 6 network scale options between 11 kV plant and 400 kV system. Design: reactive power capability curves, PSS/E and PSCAD model support and fault level verification of switchgear. Used by renewable developers seeking connectivity, utilities and consultants and BESS integrators. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code and IEEE 1547. Mobilisation 2-6 weeks; serves West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Pallava
- Model
- PAL-5E1 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- 2-6 weeks
- Warranty
- Clarifications to utility at no cost
- Standards
- CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code, IEEE 1547
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Network scale11 kV plantPAL-5E1-01 | Network scale: 11 kV plant | 1 report · 2-6 weeks | for verified buyers |
| Network scale33 kV plantPAL-5E1-02 | Network scale: 33 kV plant | 1 report · 2-6 weeks | for verified buyers |
| Network scale66 kV systemPAL-5E1-03 | Network scale: 66 kV system | 1 report · 2-6 weeks | for verified buyers |
| Network scale132 kV systemPAL-5E1-04 | Network scale: 132 kV system | 1 report · 2-6 weeks | for verified buyers |
| Network scale220 kV systemPAL-5E1-05 | Network scale: 220 kV system | 1 report · 2-6 weeks | for verified buyers |
| Network scale400 kV systemPAL-5E1-06 | Network scale: 400 kV system | 1 report · 2-6 weeks | for verified buyers |
Specifications
| Network scale | 11 kV plant to 400 kV system (see variants) |
|---|---|
| Study type | Load flow and short circuit |
| Software | DIgSILENT PowerFactory |
| Model data | Utility network model |
| Deliverables | Model files and relay settings |
| Grid code checks | Voltage and reactive power capability |
| Review | Lender reviewmade to order: Utility submission support |
| Scenarios | Multiple dispatch cases |
| Team | Power system engineermade to order: Lead plus modelling specialist |
| Turnaround | 4-6 weeks |
| Validation | Compared with measured data |