Catalogue / Feasibility studies & DPR
Pre-feasibility study for BESS and pumped storage, Duo seriesSample
by Pallava Engineering Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Pallava Engineering Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Duo service of pre-feasibility study for BESS and pumped storage by Pallava covers 5 project capacity options (10 MW to 1 GW). Highlights: capex and opex benchmarks for Indian market, risk register with mitigations and lender-format financial model. Suited to industrial captive consumers, funds and lenders and developers and IPPs. Delivered in line with MNRE Guidelines, CERC Tariff Regulations and IEC 61724-1. Mobilisation 3-12 weeks; serves West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Pallava
- Model
- PAL-BB7 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- 3-12 weeks
- Warranty
- As per contract
- Standards
- MNRE Guidelines, CERC Tariff Regulations, IEC 61724-1
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Project capacity10 MWPAL-BB7-01 | Project capacity: 10 MW | 1 report · 3-12 weeks | on quote |
| Project capacity50 MWPAL-BB7-02 | Project capacity: 50 MW | 1 report · 3-12 weeks | on quote |
| Project capacity100 MWPAL-BB7-03 | Project capacity: 100 MW | 1 report · 3-12 weeks | on quote |
| Project capacity500 MWPAL-BB7-04 | Project capacity: 500 MW | 1 report · 3-12 weeks | on quote |
| Project capacity1 GWPAL-BB7-05 | Project capacity: 1 GW | 1 report · 3-12 weeks | on quote |
Specifications
| Project capacity | 10 MW to 1 GW (see variants) |
|---|---|
| Scope | Pre-feasibility |
| Energy yield | PVsyst P50/P90made to order: WAsP wind energy assessment |
| Financial model | Sensitivity and tariff analysis |
| Grid assessment | GNA/connectivity route study |
| Site visit | One visit with drone surveymade to order: Two visits with geotech |
| Environmental screening | Included |
| Team | Multi-disciplinary team of 5made to order: Lead consultant and analyst |
| Turnaround | 3-4 weeksmade to order: 6-8 weeks / 10-12 weeks |
| Deliverable | Report, model and presentationmade to order: PDF report with Excel model |
| Review rounds | Two with client commentsmade to order: One |