Catalogue / Resource assessment (solar, wind, hydro)
Hydro resource and flow duration study, Neo seriesSample
by Pallava Engineering Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Pallava Engineering Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Neo service of hydro resource and flow duration study by Pallava covers 4 measurement duration options (3 months to 18 months). Key features: extreme wind and wake studies, loss factors for local conditions and turbine and module selection input. Suited to wind and solar developers, state agencies mapping resource and hybrid project planners. Delivered in line with IEC 61400-12-1, IEC 61724-1 and IEC 61400-15. Mobilisation Desktop in 2-3 weeks; serves West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Pallava
- Model
- PAL-C86 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- Desktop in 2-3 weeks
- Warranty
- Data availability guarantee above 95%
- Standards
- IEC 61400-12-1, IEC 61724-1, IEC 61400-15
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Measurement duration3 monthsPAL-C86-01 | Measurement duration: 3 months | 1 report · Desktop in 2-3 weeks | for verified buyers |
| Measurement duration6 monthsPAL-C86-02 | Measurement duration: 6 months | 1 report · Desktop in 2-3 weeks | for verified buyers |
| Measurement duration12 monthsPAL-C86-03 | Measurement duration: 12 months | 1 report · Campaign 3-24 months | for verified buyers |
| Measurement duration18 monthsPAL-C86-04 | Measurement duration: 18 months | 1 report · Campaign 3-24 months | for verified buyers |
Specifications
| Measurement duration | 3 months to 18 months (see variants) |
|---|---|
| Technology | Small hydromade to order: Solar GHI/DNI / Wind |
| Data source | Hybrid with MCPmade to order: Satellite and reanalysis / On-site measurement |
| Equipment | Class A pyranometer station |
| Uncertainty | P50/P90 with uncertainty budgetmade to order: Bankable assessment |
| Modelling | PVsyst, SAMmade to order: WAsP, WindPRO |
| Deliverable | Hourly time series dataset |
| Calibration | Traceable calibrationmade to order: Calibration pre and post campaign |
| Site count | Single sitemade to order: Multi-site comparison |
| Maintenance | Remote health checksmade to order: Quarterly site visit |
| Turnaround | Report in 3 weeks |