Catalogue / Roads, drains & culverts
WBM and bituminous road, Duo seriesSample
by Pallavaparam Structures (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Pallavaparam Structures (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Duo service of WBM and bituminous road by Pallavaparam covers 3 road width options (7.0 m to 10 m). Design: drains sloped to discharge points, material test records provided and levels set by total station. Suited to plant site drainage, solar park internal roads and wind farm access roads. Delivered in line with IRC 37, IRC SP 62 and IS 456. Mobilisation 4-6 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Pallavaparam
- Model
- PAL-784 series
- Listing type
- Service
- Unit
- m
- Minimum order
- 1 m
- Lead time
- 4-6 weeks
- Warranty
- 24 months defect liability
- Standards
- IRC 37, IRC SP 62, IS 456
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Road width7.0 mPAL-784-01 | Road width: 7.0 m | 1 m · 4-6 weeks | on quote |
| Road width7.5 mPAL-784-02 | Road width: 7.5 m | 1 m · 4-6 weeks | on quote |
| Road width10 mPAL-784-03 | Road width: 10 m | 1 m · 4-6 weeks | on quote |
Specifications
| Road width | 7.0 m to 10 m (see variants) |
|---|---|
| Pavement type | Interlocking pavermade to order: WBM + bituminous / Rigid concrete M30 |
| Sub-base | GSB 200 mm |
| Base course | DLC 150 mmmade to order: WMM 250 mm |
| Drain type | Open RCC U-drain |
| Culvert pipe | NP3 900 mm |
| Shoulder | Earthen 1 mmade to order: Gravel 0.5 m |
| Camber | 3% |
| Wheel load design | IRC 70Rmade to order: IRC Class A |
| Compaction test | Proctor density 98% |