Catalogue / Transformer & scrap disposal

No photo yet

Used transformer disposal and refurbishment, Ultra 9 seriesSample

by Pallavaprabha Corporate Services (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Pallavaprabha Corporate Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

The Ultra 9 service of used transformer disposal and refurbishment by Pallavaprabha covers 3 scrap quantity options (5 tonnes to 50 tonnes). Key features: refurbishment option for usable units, transparent weighment and environmental compliance. Suited to EPC contractors, substation upgrades and industrial plants. Delivered in line with Hazardous and Other Wastes Rules 2016, Environment Protection Act 1986 and Central Pollution Control Board Guidelines. Mobilisation Pick-up in 5-10 days; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Pallavaprabha
Model
PAL-431 series
Listing type
Service
Unit
lot
Minimum order
1 lot
Lead time
Pick-up in 5-10 days
Warranty
Certificate of disposal
Standards
Hazardous and Other Wastes Rules 2016, Environment Protection Act 1986, Central Pollution Control Board Guidelines
Delivers to
North India
GST rate
18 %
Country of origin
India (imported sub-assemblies)
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Scrap quantity5 tonnesPAL-431-01Scrap quantity: 5 tonnes1 lot · Pick-up in 5-10 dayson quote
Scrap quantity10 tonnesPAL-431-02Scrap quantity: 10 tonnes1 lot · Pick-up in 5-10 dayson quote
Scrap quantity50 tonnesPAL-431-03Scrap quantity: 50 tonnes1 lot · Pick-up in 5-10 dayson quote

Specifications

Scrap quantity5 tonnes to 50 tonnes (see variants)
Scrap typeOilmade to order: Transformers / Cables / Switchgear
ProcessOil draining and treatmentmade to order: Dismantling and segregation / Auction
AuthorisationHazardous waste permit
PCB testingNot applicable
CollectionPick-up with crane
DocumentationWeighment slips, form 10
ValuationFixed price
PaymentWithin 7 days
SafetySpill containmentmade to order: PPE crew
Timeline1-2 weeksmade to order: 3-4 weeks

BARREL: Bharat Atom Renewable Resources Energy Limited