Catalogue / Solar module recycling
Collection and transport of used modules, Xtra 9 seriesSample
by Pallavaprabha Corporate Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Pallavaprabha Corporate Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Pallavaprabha Xtra 9 collection and transport of used modules, offered in 4 quantity options from 1 tonne to 50 tonnes. Design: collection logistics included, reuse screening for good modules and traceable chain of custody. Suited to rooftop owners, module manufacturers and solar plant owners with repowering. Delivered in line with E-Waste (Management) Rules 2022, CPCB Guidelines and Hazardous Waste Rules 2016. Mobilisation Processing 2-8 weeks; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Pallavaprabha
- Model
- PAL-9D9 series
- Listing type
- Service
- Unit
- tonne
- Minimum order
- 1 tonne
- Lead time
- Processing 2-8 weeks
- Warranty
- As per authorisation
- Standards
- E-Waste (Management) Rules 2022, CPCB Guidelines, Hazardous Waste Rules 2016
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Quantity1 tonnePAL-9D9-01 | Quantity: 1 tonne | 1 tonne · Processing 2-8 weeks | on quote |
| Quantity5 tonnesPAL-9D9-02 | Quantity: 5 tonnes | 1 tonne · Processing 2-8 weeks | on quote |
| Quantity10 tonnesPAL-9D9-03 | Quantity: 10 tonnes | 1 tonne · Processing 2-8 weeks | on quote |
| Quantity50 tonnesPAL-9D9-04 | Quantity: 50 tonnes | 1 tonne · Processing 2-8 weeks | on quote |
Specifications
| Quantity | 1 tonne to 50 tonnes (see variants) |
|---|---|
| Process | Mechanical separation |
| Recovery rate | 90%+made to order: 85% |
| Materials recovered | Silicon, silvermade to order: Glass, aluminium frame, copper |
| Authorisation | Authorised under E-waste Rulesmade to order: Registered recycler |
| Collection | Client delivers |
| Certificate | EPR certificate |
| Data | Traceability recordsmade to order: Weight and material report |
| Turnaround | 2-4 weeksmade to order: 1-2 months |
| Hazard handling | Lead and cadmium controls |
| Pricing basis | Per tonnemade to order: Net of recovered value |