Catalogue / Solar module recycling
Collection and transport of used modules, Pro seriesSample
by Phasetron Energy Markets (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Phasetron Energy Markets (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Phasetron Pro collection and transport of used modules, offered in 5 quantity options from 1 tonne to 100 tonnes. Design: certificate of recycling for compliance, traceable chain of custody and collection logistics included. Suited to EPC contractors, solar plant owners with repowering and module manufacturers. Delivered in line with E-Waste (Management) Rules 2022, CPCB Guidelines and Hazardous Waste Rules 2016. Mobilisation Processing 2-8 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Phasetron
- Model
- PHA-9D8 series
- Listing type
- Service
- Unit
- tonne
- Minimum order
- 1 tonne
- Lead time
- Processing 2-8 weeks
- Warranty
- Certificate of destruction
- Standards
- E-Waste (Management) Rules 2022, CPCB Guidelines, Hazardous Waste Rules 2016
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Quantity1 tonnePHA-9D8-01 | Quantity: 1 tonne | 1 tonne · Processing 2-8 weeks | on quote |
| Quantity5 tonnesPHA-9D8-02 | Quantity: 5 tonnes | 1 tonne · Processing 2-8 weeks | on quote |
| Quantity10 tonnesPHA-9D8-03 | Quantity: 10 tonnes | 1 tonne · Processing 2-8 weeks | on quote |
| Quantity50 tonnesPHA-9D8-04 | Quantity: 50 tonnes | 1 tonne · Processing 2-8 weeks | on quote |
| Quantity100 tonnesPHA-9D8-05 | Quantity: 100 tonnes | 1 tonne · Processing 2-8 weeks | on quote |
Specifications
| Quantity | 1 tonne to 100 tonnes (see variants) |
|---|---|
| Process | Thermal and chemical recoverymade to order: Mechanical separation / Reuse testing |
| Recovery rate | 90%+ |
| Materials recovered | Silicon, silver |
| Authorisation | Registered recycler |
| Collection | Client deliversmade to order: Pick-up arranged |
| Certificate | Recycling certificate |
| Data | Traceability recordsmade to order: Weight and material report |
| Turnaround | 2-4 weeks |
| Hazard handling | Lead and cadmium controlsmade to order: Broken-glass safe handling |
| Pricing basis | Per tonne |