Catalogue / Industrial heat pumps
High temperature industrial heat pump, Max 3 seriesSample
by Prakashtek Furnaces (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Prakashtek Furnaces (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Prakashtek Max 3 high temperature industrial heat pump, offered in 5 heating capacity options from 150 kW to 5 MW. Key features: integrated buffer tank option, cascade configuration for higher lift and cuts fuel cost against boilers. Used by pharma and food, paper mills and chemical processes. Designed and tested to IS 8148, ISO 13256-1 and EN 14511. Lead time 12-16 weeks; delivers to All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Prakashtek
- Model
- PRA-995 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 1 nos
- Lead time
- 12-16 weeks
- Warranty
- 12 months
- Standards
- IS 8148, ISO 13256-1, EN 14511
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Corrugated box on pallet
- Delivery terms
- FOR nearest railhead
- Returns
- No returns on made-to-order items
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Heating capacity150 kWPRA-995-01 | Heating capacity: 150 kW | 1 nos · 12-16 weeks | for verified buyers |
| Heating capacity500 kWPRA-995-02 | Heating capacity: 500 kW | 1 nos · 12-16 weeks | for verified buyers |
| Heating capacity1 MWPRA-995-03 | Heating capacity: 1 MW | 1 nos · 12-16 weeks | for verified buyers |
| Heating capacity2.5 MWPRA-995-04 | Heating capacity: 2.5 MW | 1 nos · 20-26 weeks | for verified buyers |
| Heating capacity5 MWPRA-995-05 | Heating capacity: 5 MW | 1 nos · 20-26 weeks | for verified buyers |
Specifications
| Heating capacity | 150 kW to 5 MW (see variants) |
|---|---|
| Refrigerant | R1234zemade to order: R134a / R717 ammonia / R245fa |
| Heat source | Ambient air |
| Source temperature | 40-80 deg Cmade to order: 20-40 deg C |
| Sink temperature | Up to 120 deg C |
| COP | 4.5 |
| Compressor | Turbomade to order: Screw / Piston |
| Supply | 6.6 kV |
| Control | PLC with BMS link |
| Heat exchangers | Shell and tubemade to order: Plate SS 316 |
| Noise | < 75 dB(A) |
| Footprint | Skid-mounted |