Catalogue / Testing & commissioning
Solar plant commissioning and performance ratio test, Elite 2 seriesSample
by Prakashtron Technical Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Prakashtron Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Elite 2 service of solar plant commissioning and performance ratio test by Prakashtron covers 6 plant capacity options (1 MW to 100 MW). Key features: test formats agreed before mobilisation, live relay setting verification and thermography of terminations before charging. Suited to DISCOM and STU charging, EPC handover to owners and repowering projects. Delivered in line with IEC 62446-1, IEC 61724-1 and CEA (Technical Standards for Connectivity) Regulations. Mobilisation Mobilisation in 5 days; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Prakashtron
- Model
- PRA-9A8 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Mobilisation in 5 days
- Warranty
- Retest at no cost if failure traced to test error
- Standards
- IEC 62446-1, IEC 61724-1, CEA (Technical Standards for Connectivity) Regulations
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Plant capacity1 MWPRA-9A8-01 | Plant capacity: 1 MW | 1 MW · Mobilisation in 5 days | on quote |
| Plant capacity5 MWPRA-9A8-02 | Plant capacity: 5 MW | 1 MW · Mobilisation in 5 days | on quote |
| Plant capacity10 MWPRA-9A8-03 | Plant capacity: 10 MW | 1 MW · Mobilisation in 5 days | on quote |
| Plant capacity25 MWPRA-9A8-04 | Plant capacity: 25 MW | 1 MW · Mobilisation in 5 days | on quote |
| Plant capacity50 MWPRA-9A8-05 | Plant capacity: 50 MW | 1 MW · Report in 7 days | on quote |
| Plant capacity100 MWPRA-9A8-06 | Plant capacity: 100 MW | 1 MW · Report in 7 days | on quote |
Specifications
| Plant capacity | 1 MW to 100 MW (see variants) |
|---|---|
| Tests covered | String IV curve, insulation, earthmade to order: Transformer, switchgear, relay tests / Full plant functional and PR test |
| Instruments | Relay test set, thermal cameramade to order: Calibrated IV tracer, megger, CRM |
| Calibration | Calibration valid at test datemade to order: NABL traceable certificates |
| Team | Commissioning engineer plus 2 testers |
| Statutory support | CEIG inspection coordination |
| Reports | Commissioning dossier with as-built |
| Duration on site | 10-14 days |
| Performance guarantee test | 72-hour trial runmade to order: Capacity and PR test per contract |
| Grid code checks | Reactive power and ramp rate |
| Payment | Milestone on energisationmade to order: 50% on start, 50% on report |