Catalogue / Grid connectivity & GNA applications
Connectivity application to STU, Core 9 seriesSample
by Prakashtron Technical Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Prakashtron Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Core 9 service of connectivity application to STU by Prakashtron covers 4 capacity applied options (100 MW to 1000 MW). Design: regular updates of queue status, bank guarantee timeline tracking and preparation of mandatory technical details. Used by green hydrogen projects, renewable developers and storage developers. Delivered in line with CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations and Indian Electricity Grid Code. Mobilisation Filing in 1-2 weeks; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Prakashtron
- Model
- PRA-663 series
- Listing type
- Service
- Unit
- application
- Minimum order
- 1 application
- Lead time
- Filing in 1-2 weeks
- Warranty
- Rework of deficient applications
- Standards
- CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Capacity applied100 MWPRA-663-01 | Capacity applied: 100 MW | 1 application · Filing in 1-2 weeks | for verified buyers |
| Capacity applied250 MWPRA-663-02 | Capacity applied: 250 MW | 1 application · Filing in 1-2 weeks | for verified buyers |
| Capacity applied500 MWPRA-663-03 | Capacity applied: 500 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied1000 MWPRA-663-04 | Capacity applied: 1000 MW | 1 application · Grant 3-9 months | for verified buyers |
Specifications
| Capacity applied | 100 MW to 1000 MW (see variants) |
|---|---|
| Application | Bothmade to order: Connectivity / GNA |
| Scope | Document preparation and filingmade to order: End-to-end liaison |
| Bank guarantee | Arranged by client |
| Studies | Grid impact summarymade to order: Detailed power system study |
| Portal handling | CTUIL portalmade to order: STU portal |
| Team | Dedicated managermade to order: Regulatory lead and engineer |
| Timeline | Filing in 2 weeks |
| Technical documents | Switchyard layout and GA drawings |
| Queries | Responded within 2 days |
| Fee basis | Fixed plus successmade to order: Fixed |