Catalogue / Installation & erection

No photo yet

Inverter, transformer and switchgear erection, Ultra seriesSample

by Prakashtron Technical Services (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Prakashtron Technical Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Prakashtron Ultra inverter, transformer and switchgear erection, offered in 6 installation scope options from 1 MW to 100 MW. Highlights: mobile team available for remote sites, module handling to avoid micro-cracks and torque-verified structure and module fixing. Used by c&I rooftop and ground mount, utility solar parks and hybrid projects. Delivered in line with IS 732 (Electrical Wiring), IEC 62548 and CEA (Measures relating to Safety) Regulations. Mobilisation Mobilisation in 10 days; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Prakashtron
Model
PRA-DB4 series
Listing type
Service
Unit
MW
Minimum order
1 MW
Lead time
Mobilisation in 10 days
Warranty
Workmanship 12 months
Standards
IS 732 (Electrical Wiring), IEC 62548, CEA (Measures relating to Safety) Regulations
Delivers to
South India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Installation scope1 MWPRA-DB4-01Installation scope: 1 MW1 MW · Mobilisation in 10 dayson quote
Installation scope5 MWPRA-DB4-02Installation scope: 5 MW1 MW · Mobilisation in 10 dayson quote
Installation scope10 MWPRA-DB4-03Installation scope: 10 MW1 MW · Mobilisation in 10 dayson quote
Installation scope25 MWPRA-DB4-04Installation scope: 25 MW1 MW · Mobilisation in 10 dayson quote
Installation scope50 MWPRA-DB4-05Installation scope: 50 MW1 MW · Phased by blockon quote
Installation scope100 MWPRA-DB4-06Installation scope: 100 MW1 MW · Phased by blockon quote

Specifications

Installation scope1 MW to 100 MW (see variants)
ScopeStructure and module installation
Manpower deployedPeak crew of 200
SupervisionSite engineer and safety officer
EquipmentOwn cranes and erection toolsmade to order: Pile driver, crane, telehandler
Quality planISO 9001 QAP with hold points
SafetyLost-time-injury-free target, HIRA
LicenceElectrical contractor licencemade to order: Class A contractor registration
InsuranceCAR, WC and third-party liability
ReportingWeekly report with look-ahead planmade to order: Daily progress report
Payment termsMilestone based with 10% retentionmade to order: Monthly running bills

BARREL: Bharat Atom Renewable Resources Energy Limited