Catalogue / Installation & erection
Inverter, transformer and switchgear erection, Ultra seriesSample
by Prakashtron Technical Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Prakashtron Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Prakashtron Ultra inverter, transformer and switchgear erection, offered in 6 installation scope options from 1 MW to 100 MW. Highlights: mobile team available for remote sites, module handling to avoid micro-cracks and torque-verified structure and module fixing. Used by c&I rooftop and ground mount, utility solar parks and hybrid projects. Delivered in line with IS 732 (Electrical Wiring), IEC 62548 and CEA (Measures relating to Safety) Regulations. Mobilisation Mobilisation in 10 days; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Prakashtron
- Model
- PRA-DB4 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Mobilisation in 10 days
- Warranty
- Workmanship 12 months
- Standards
- IS 732 (Electrical Wiring), IEC 62548, CEA (Measures relating to Safety) Regulations
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Installation scope1 MWPRA-DB4-01 | Installation scope: 1 MW | 1 MW · Mobilisation in 10 days | on quote |
| Installation scope5 MWPRA-DB4-02 | Installation scope: 5 MW | 1 MW · Mobilisation in 10 days | on quote |
| Installation scope10 MWPRA-DB4-03 | Installation scope: 10 MW | 1 MW · Mobilisation in 10 days | on quote |
| Installation scope25 MWPRA-DB4-04 | Installation scope: 25 MW | 1 MW · Mobilisation in 10 days | on quote |
| Installation scope50 MWPRA-DB4-05 | Installation scope: 50 MW | 1 MW · Phased by block | on quote |
| Installation scope100 MWPRA-DB4-06 | Installation scope: 100 MW | 1 MW · Phased by block | on quote |
Specifications
| Installation scope | 1 MW to 100 MW (see variants) |
|---|---|
| Scope | Structure and module installation |
| Manpower deployed | Peak crew of 200 |
| Supervision | Site engineer and safety officer |
| Equipment | Own cranes and erection toolsmade to order: Pile driver, crane, telehandler |
| Quality plan | ISO 9001 QAP with hold points |
| Safety | Lost-time-injury-free target, HIRA |
| Licence | Electrical contractor licencemade to order: Class A contractor registration |
| Insurance | CAR, WC and third-party liability |
| Reporting | Weekly report with look-ahead planmade to order: Daily progress report |
| Payment terms | Milestone based with 10% retentionmade to order: Monthly running bills |