Catalogue / Cabling, trenching & HDD works

No photo yet

Duct bank and conduit installation, Plus seriesSample

by Prakashtron Technical Services (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Prakashtron Technical Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Duct bank and conduit installation from Prakashtron, Plus series: 4 cable route length options between 2 km and 20 km. Highlights: drum handling and pulling tension control, warning tape and marker installation and utility locating before excavation. Suited to industrial plant cabling, renewable plant internal networks and railway and highway crossings. Delivered in line with IS 1255 (Cable Installation), IS 7098 (XLPE Cables) and IEC 60840. Mobilisation Permits may extend timeline; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Prakashtron
Model
PRA-C13 series
Listing type
Service
Unit
km
Minimum order
1 km
Lead time
Permits may extend timeline
Warranty
Workmanship 12 months
Standards
IS 1255 (Cable Installation), IS 7098 (XLPE Cables), IEC 60840
Delivers to
South India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Cable route length2 kmPRA-C13-01Cable route length: 2 km1 km · Permits may extend timelineon quote
Cable route length5 kmPRA-C13-02Cable route length: 5 km1 km · Permits may extend timelineon quote
Cable route length10 kmPRA-C13-03Cable route length: 10 km1 km · Permits may extend timelineon quote
Cable route length20 kmPRA-C13-04Cable route length: 20 km1 km · Permits may extend timelineon quote

Specifications

Cable route length2 km to 20 km (see variants)
MethodOpen trenchmade to order: Trenchless HDD / Trench plus HDD for crossings
HDD capacityUp to 250 mm bore
Trench depth1.2 mmade to order: 0.9 m / 1.5 m
Cable typeLT armouredmade to order: 11/33 kV XLPE
JointingHeat shrinkmade to order: Cold shrink / Premoulded
RestorationBackfill and compaction onlymade to order: Road and footpath restoration
PermissionsClient arranges
TestingHipot and sheath test
Productivity50 m per day HDDmade to order: 300 m per day open trench
CrewTrenching team of 15made to order: HDD crew of 8 with rig

BARREL: Bharat Atom Renewable Resources Energy Limited