Catalogue / Grid connectivity & GNA applications
Evacuation approval for solar and wind parks, Ultra 2 seriesSample
by Prakashtron Technical Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Prakashtron Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Prakashtron Ultra 2 evacuation approval for solar and wind parks, offered in 4 capacity applied options from 50 MW to 500 MW. Key features: regular updates of queue status, preparation of mandatory technical details and bank guarantee timeline tracking. Used by industrial captive generators, renewable developers and storage developers. Delivered in line with CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations and Indian Electricity Grid Code. Mobilisation Grant 3-9 months; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Prakashtron
- Model
- PRA-F33 series
- Listing type
- Service
- Unit
- application
- Minimum order
- 1 application
- Lead time
- Grant 3-9 months
- Warranty
- As per contract
- Standards
- CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Capacity applied50 MWPRA-F33-01 | Capacity applied: 50 MW | 1 application · Grant 3-9 months | on quote |
| Capacity applied100 MWPRA-F33-02 | Capacity applied: 100 MW | 1 application · Grant 3-9 months | on quote |
| Capacity applied250 MWPRA-F33-03 | Capacity applied: 250 MW | 1 application · Grant 3-9 months | on quote |
| Capacity applied500 MWPRA-F33-04 | Capacity applied: 500 MW | 1 application · Grant 3-9 months | on quote |
Specifications
| Capacity applied | 50 MW to 500 MW (see variants) |
|---|---|
| Application | Connectivity |
| Scope | End-to-end liaison |
| Bank guarantee | Arranged by clientmade to order: Arranged through partner bank |
| Studies | Grid impact summary |
| Portal handling | CTUIL portal |
| Team | Dedicated managermade to order: Regulatory lead and engineer |
| Timeline | Filing in 2 weeksmade to order: Approval 3-6 months |
| Technical documents | Switchyard layout and GA drawingsmade to order: SLD, land proof, board resolution |
| Queries | Until grant |
| Fee basis | Fixedmade to order: Fixed plus success |