Catalogue / Civil & foundation works

No photo yet

Pile foundations for module mounting structures, Ultra 9 seriesSample

by Prakashtron Technical Services (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Prakashtron Technical Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Pile foundations for module mounting structures from Prakashtron, Ultra 9 series: 3 works volume options between 10 MW equivalent and 50 MW equivalent. Highlights: local labour employed where possible, pile layout tolerance maintained to design and daily quantity and progress log. Suited to industrial plants, solar parks and substations and control rooms. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation Mobilisation in 10 days; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Prakashtron
Model
PRA-1C3 series
Listing type
Service
Unit
job
Minimum order
1 job
Lead time
Mobilisation in 10 days
Warranty
Structural defect liability 24 months
Standards
IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
Delivers to
South India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Works volume10 MW equivalentPRA-1C3-01Works volume: 10 MW equivalent1 job · Mobilisation in 10 dayson quote
Works volume25 MW equivalentPRA-1C3-02Works volume: 25 MW equivalent1 job · Mobilisation in 10 dayson quote
Works volume50 MW equivalentPRA-1C3-03Works volume: 50 MW equivalent1 job · Mobilisation in 10 dayson quote

Specifications

Works volume10 MW equivalent to 50 MW equivalent (see variants)
Foundation typeRaft or isolated footing
Concrete gradeM25made to order: M30 / M40 for turbine foundation
Pull-out testing2% piles testedmade to order: Random test plus lateral load
ReinforcementFe 500D TMT
Roads and drainageNot includedmade to order: Murram road, 4 m wide / WBM road with culverts
BoundaryChain link fence 2.4 m
QualityNABL lab testing of materialsmade to order: Cube test reports per pour
MachineryPiling rigs and excavatorsmade to order: Batching plant at site
Duration4-8 weeksmade to order: 3-6 months
Payment termsMeasured running billsmade to order: Item rate with retention

BARREL: Bharat Atom Renewable Resources Energy Limited