Catalogue / Civil & foundation works
Pile foundations for module mounting structures, Ultra 9 seriesSample
by Prakashtron Technical Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Prakashtron Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Pile foundations for module mounting structures from Prakashtron, Ultra 9 series: 3 works volume options between 10 MW equivalent and 50 MW equivalent. Highlights: local labour employed where possible, pile layout tolerance maintained to design and daily quantity and progress log. Suited to industrial plants, solar parks and substations and control rooms. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation Mobilisation in 10 days; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Prakashtron
- Model
- PRA-1C3 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- Mobilisation in 10 days
- Warranty
- Structural defect liability 24 months
- Standards
- IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Works volume10 MW equivalentPRA-1C3-01 | Works volume: 10 MW equivalent | 1 job · Mobilisation in 10 days | on quote |
| Works volume25 MW equivalentPRA-1C3-02 | Works volume: 25 MW equivalent | 1 job · Mobilisation in 10 days | on quote |
| Works volume50 MW equivalentPRA-1C3-03 | Works volume: 50 MW equivalent | 1 job · Mobilisation in 10 days | on quote |
Specifications
| Works volume | 10 MW equivalent to 50 MW equivalent (see variants) |
|---|---|
| Foundation type | Raft or isolated footing |
| Concrete grade | M25made to order: M30 / M40 for turbine foundation |
| Pull-out testing | 2% piles testedmade to order: Random test plus lateral load |
| Reinforcement | Fe 500D TMT |
| Roads and drainage | Not includedmade to order: Murram road, 4 m wide / WBM road with culverts |
| Boundary | Chain link fence 2.4 m |
| Quality | NABL lab testing of materialsmade to order: Cube test reports per pour |
| Machinery | Piling rigs and excavatorsmade to order: Batching plant at site |
| Duration | 4-8 weeksmade to order: 3-6 months |
| Payment terms | Measured running billsmade to order: Item rate with retention |