Catalogue / Grid connectivity & GNA applications
Connectivity application to STU, Prime 5 seriesSample
by Prithvitek Infra Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Prithvitek Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Prime 5 service of connectivity application to STU by Prithvitek covers 5 capacity applied options (50 MW to 1000 MW). Highlights: regular updates of queue status, bank guarantee timeline tracking and eligibility check before filing. Suited to green hydrogen projects, storage developers and industrial captive generators. Delivered in line with CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations and Indian Electricity Grid Code. Mobilisation Filing in 1-2 weeks; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Prithvitek
- Model
- PRI-669 series
- Listing type
- Service
- Unit
- application
- Minimum order
- 1 application
- Lead time
- Filing in 1-2 weeks
- Warranty
- Rework of deficient applications
- Standards
- CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Capacity applied50 MWPRI-669-01 | Capacity applied: 50 MW | 1 application · Filing in 1-2 weeks | on quote |
| Capacity applied100 MWPRI-669-02 | Capacity applied: 100 MW | 1 application · Filing in 1-2 weeks | on quote |
| Capacity applied250 MWPRI-669-03 | Capacity applied: 250 MW | 1 application · Filing in 1-2 weeks | on quote |
| Capacity applied500 MWPRI-669-04 | Capacity applied: 500 MW | 1 application · Grant 3-9 months | on quote |
| Capacity applied1000 MWPRI-669-05 | Capacity applied: 1000 MW | 1 application · Grant 3-9 months | on quote |
Specifications
| Capacity applied | 50 MW to 1000 MW (see variants) |
|---|---|
| Application | Connectivity |
| Scope | End-to-end liaison |
| Bank guarantee | Arranged by clientmade to order: Arranged through partner bank |
| Studies | Grid impact summary |
| Portal handling | STU portalmade to order: CTUIL portal |
| Team | Regulatory lead and engineermade to order: Dedicated manager |
| Timeline | Filing in 2 weeks |
| Technical documents | SLD, land proof, board resolutionmade to order: Switchyard layout and GA drawings |
| Queries | Until grantmade to order: Responded within 2 days |
| Fee basis | Fixed plus success |