Catalogue / Grid connectivity & GNA applications
LTA-to-GNA transition advisory, Core seriesSample
by Prithvitek Infra Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Prithvitek Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Core service of LTA-to-GNA transition advisory by Prithvitek covers 5 capacity applied options (10 MW to 500 MW). Highlights: bank guarantee timeline tracking, eligibility check before filing and preparation of mandatory technical details. Suited to industrial captive generators, storage developers and green hydrogen projects. Delivered in line with CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations and Indian Electricity Grid Code. Mobilisation Filing in 1-2 weeks; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Prithvitek
- Model
- PRI-0B8 series
- Listing type
- Service
- Unit
- application
- Minimum order
- 1 application
- Lead time
- Filing in 1-2 weeks
- Warranty
- As per contract
- Standards
- CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Capacity applied10 MWPRI-0B8-01 | Capacity applied: 10 MW | 1 application · Filing in 1-2 weeks | on quote |
| Capacity applied50 MWPRI-0B8-02 | Capacity applied: 50 MW | 1 application · Filing in 1-2 weeks | on quote |
| Capacity applied100 MWPRI-0B8-03 | Capacity applied: 100 MW | 1 application · Filing in 1-2 weeks | on quote |
| Capacity applied250 MWPRI-0B8-04 | Capacity applied: 250 MW | 1 application · Grant 3-9 months | on quote |
| Capacity applied500 MWPRI-0B8-05 | Capacity applied: 500 MW | 1 application · Grant 3-9 months | on quote |
Specifications
| Capacity applied | 10 MW to 500 MW (see variants) |
|---|---|
| Application | Connectivity |
| Scope | End-to-end liaison |
| Bank guarantee | Arranged by client |
| Studies | Grid impact summary |
| Portal handling | CTUIL portalmade to order: STU portal |
| Team | Regulatory lead and engineer |
| Timeline | Approval 3-6 months |
| Technical documents | SLD, land proof, board resolution |
| Queries | Until grantmade to order: Responded within 2 days |
| Fee basis | Fixed plus success |