Peak load management and curtailment, Flex seriesSample
by Pushpakmax Energy Markets (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Pushpakmax Energy Markets (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Pushpakmax Flex peak load management and curtailment, offered in 3 curtailable load options from 10 MW to 50 MW. Design: integration with plant process limits, settlement transparency and revenue for flexible loads. Used by cold storage and water pumping, commercial buildings and DISCOMs needing peak relief. Delivered in line with CERC DR Guidelines, State TOD Tariff Orders and OpenADR 2.0b. Mobilisation Assessment in 2-3 weeks; serves West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Pushpakmax
- Model
- PUS-ED8 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Assessment in 2-3 weeks
- Warranty
- As per programme terms
- Standards
- CERC DR Guidelines, State TOD Tariff Orders, OpenADR 2.0b
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Curtailable load10 MWPUS-ED8-01 | Curtailable load: 10 MW | 1 MW · Assessment in 2-3 weeks | for verified buyers |
| Curtailable load25 MWPUS-ED8-02 | Curtailable load: 25 MW | 1 MW · Assessment in 2-3 weeks | for verified buyers |
| Curtailable load50 MWPUS-ED8-03 | Curtailable load: 50 MW | 1 MW · Assessment in 2-3 weeks | for verified buyers |
Specifications
| Curtailable load | 10 MW to 50 MW (see variants) |
|---|---|
| Programme | Aggregator DR |
| Control | Manual |
| Notice | Day aheadmade to order: 2 hours / 15 minutes |
| Duration per event | 4 hours |
| Events per year | 50 |
| Metering | Dedicated interval meter |
| Incentive sharing | 80:20made to order: 70:30 customer:aggregator |
| Baseline method | Regressionmade to order: 10-day average |
| Reporting | Monthly savingsmade to order: Event report |
| Contract term | 1 year |