Detailed energy audit for industrial plants, Xtra seriesSample
by Pushpakmax Energy Markets (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Pushpakmax Energy Markets (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Xtra service of detailed energy audit for industrial plants by Pushpakmax covers 3 connected load options (100 kW to 1 MW). Design: statutory forms and BEE reporting, savings quantified with measured data and verification after implementation. Typically used for commercial buildings, hospitals and hotels and industrial plants. Delivered in line with Energy Conservation Act 2001, BEE Energy Auditor Regulations and IS 14160. Mobilisation Report in 2-4 weeks; serves West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Pushpakmax
- Model
- PUS-519 series
- Listing type
- Service
- Unit
- site
- Minimum order
- 1 site
- Lead time
- Report in 2-4 weeks
- Warranty
- Savings estimate accuracy within agreed band
- Standards
- Energy Conservation Act 2001, BEE Energy Auditor Regulations, IS 14160
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Connected load100 kWPUS-519-01 | Connected load: 100 kW | 1 site · Report in 2-4 weeks | on quote |
| Connected load500 kWPUS-519-02 | Connected load: 500 kW | 1 site · Report in 2-4 weeks | on quote |
| Connected load1 MWPUS-519-03 | Connected load: 1 MW | 1 site · Report in 2-4 weeks | on quote |
Specifications
| Connected load | 100 kW to 1 MW (see variants) |
|---|---|
| Audit level | Investment-grade audit |
| Instruments | Power analyser, thermal camera |
| Auditor | Certified Energy Managermade to order: BEE accredited energy auditor |
| Report | Implementation roadmap |
| Baseline | 12-month bills analysismade to order: Measured baseline |
| Measurement duration | 3 daysmade to order: 7 days / 14 days |
| Coverage | Utilitiesmade to order: Electrical / Electrical and thermal |
| Statutory | Form-1 and Form-2 filingmade to order: PAT scheme Form-A |
| Deliverable | Report and monitoring planmade to order: Report and presentation |
| Follow-up | Not includedmade to order: Verification after implementation |