Catalogue / Energy audits

No photo yet

Detailed energy audit for industrial plants, Xtra seriesSample

by Pushpakmax Energy Markets (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Pushpakmax Energy Markets (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

The Xtra service of detailed energy audit for industrial plants by Pushpakmax covers 3 connected load options (100 kW to 1 MW). Design: statutory forms and BEE reporting, savings quantified with measured data and verification after implementation. Typically used for commercial buildings, hospitals and hotels and industrial plants. Delivered in line with Energy Conservation Act 2001, BEE Energy Auditor Regulations and IS 14160. Mobilisation Report in 2-4 weeks; serves West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Pushpakmax
Model
PUS-519 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
Report in 2-4 weeks
Warranty
Savings estimate accuracy within agreed band
Standards
Energy Conservation Act 2001, BEE Energy Auditor Regulations, IS 14160
Delivers to
West India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Connected load100 kWPUS-519-01Connected load: 100 kW1 site · Report in 2-4 weekson quote
Connected load500 kWPUS-519-02Connected load: 500 kW1 site · Report in 2-4 weekson quote
Connected load1 MWPUS-519-03Connected load: 1 MW1 site · Report in 2-4 weekson quote

Specifications

Connected load100 kW to 1 MW (see variants)
Audit levelInvestment-grade audit
InstrumentsPower analyser, thermal camera
AuditorCertified Energy Managermade to order: BEE accredited energy auditor
ReportImplementation roadmap
Baseline12-month bills analysismade to order: Measured baseline
Measurement duration3 daysmade to order: 7 days / 14 days
CoverageUtilitiesmade to order: Electrical / Electrical and thermal
StatutoryForm-1 and Form-2 filingmade to order: PAT scheme Form-A
DeliverableReport and monitoring planmade to order: Report and presentation
Follow-upNot includedmade to order: Verification after implementation

BARREL: Bharat Atom Renewable Resources Energy Limited