Detailed energy audit for industrial plants, Eco 4 seriesSample
by Pushpakmax Energy Markets (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Pushpakmax Energy Markets (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Eco 4 service of detailed energy audit for industrial plants by Pushpakmax covers 5 connected load options (1 MW to 50 MW). Highlights: verification after implementation, power factor and harmonics assessment and savings quantified with measured data. Suited to PAT designated consumers, industrial plants and commercial buildings. Delivered in line with Energy Conservation Act 2001, BEE Energy Auditor Regulations and IS 14160. Mobilisation Report in 2-4 weeks; serves West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Pushpakmax
- Model
- PUS-517 series
- Listing type
- Service
- Unit
- site
- Minimum order
- 1 site
- Lead time
- Report in 2-4 weeks
- Warranty
- Savings estimate accuracy within agreed band
- Standards
- Energy Conservation Act 2001, BEE Energy Auditor Regulations, IS 14160
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Connected load1 MWPUS-517-01 | Connected load: 1 MW | 1 site · Report in 2-4 weeks | for verified buyers |
| Connected load5 MWPUS-517-02 | Connected load: 5 MW | 1 site · Report in 2-4 weeks | for verified buyers |
| Connected load10 MWPUS-517-03 | Connected load: 10 MW | 1 site · Report in 2-4 weeks | for verified buyers |
| Connected load25 MWPUS-517-04 | Connected load: 25 MW | 1 site · Report in 2-4 weeks | for verified buyers |
| Connected load50 MWPUS-517-05 | Connected load: 50 MW | 1 site · Report in 2-4 weeks | for verified buyers |
Specifications
| Connected load | 1 MW to 50 MW (see variants) |
|---|---|
| Audit level | Investment-grade auditmade to order: Walk-through / Detailed audit |
| Instruments | Ultrasonic flow meter, lux metermade to order: Power analyser, thermal camera |
| Auditor | Certified Energy Manager |
| Report | Savings opportunities with payback |
| Baseline | Measured baselinemade to order: 12-month bills analysis |
| Measurement duration | 14 days |
| Coverage | Electrical |
| Statutory | Form-1 and Form-2 filingmade to order: PAT scheme Form-A |
| Deliverable | Report and monitoring plan |
| Follow-up | Not includedmade to order: Verification after implementation |