Peak load management and curtailment, Elite seriesSample
by Pushpakmax Energy Markets (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Pushpakmax Energy Markets (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Pushpakmax Elite peak load management and curtailment, offered in 4 curtailable load options from 0.5 MW to 10 MW. Key features: real-time dashboards, revenue for flexible loads and settlement transparency. Used by commercial buildings, industrial plants with flexible load and cold storage and water pumping. Delivered in line with CERC DR Guidelines, State TOD Tariff Orders and OpenADR 2.0b. Mobilisation Assessment in 2-3 weeks; serves West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Pushpakmax
- Model
- PUS-ED5 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Assessment in 2-3 weeks
- Warranty
- Performance reporting
- Standards
- CERC DR Guidelines, State TOD Tariff Orders, OpenADR 2.0b
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Curtailable load0.5 MWPUS-ED5-01 | Curtailable load: 0.5 MW | 1 MW · Assessment in 2-3 weeks | for verified buyers |
| Curtailable load1 MWPUS-ED5-02 | Curtailable load: 1 MW | 1 MW · Assessment in 2-3 weeks | for verified buyers |
| Curtailable load5 MWPUS-ED5-03 | Curtailable load: 5 MW | 1 MW · Enrolment 4-8 weeks | for verified buyers |
| Curtailable load10 MWPUS-ED5-04 | Curtailable load: 10 MW | 1 MW · Enrolment 4-8 weeks | for verified buyers |
Specifications
| Curtailable load | 0.5 MW to 10 MW (see variants) |
|---|---|
| Programme | TOD optimisationmade to order: Utility DR / Aggregator DR |
| Control | Manual |
| Notice | Day ahead |
| Duration per event | 4 hoursmade to order: 1 hour |
| Events per year | 50made to order: 20 / Unlimited |
| Metering | Existing metermade to order: Dedicated interval meter |
| Incentive sharing | 70:30 customer:aggregatormade to order: 80:20 |
| Baseline method | 10-day averagemade to order: Regression |
| Reporting | Monthly savingsmade to order: Event report |
| Contract term | 1 year |