Catalogue / Third-party inspection (TPI)

No photo yet

Third-party inspection of electrical equipment at vendor works, Edge 7 seriesSample

by Rajatcore Consultants (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Rajatcore Consultants (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

The Edge 7 service of third-party inspection of electrical equipment at vendor works by Rajatcore covers 6 inspection effort options (1 man-day to 100 man-days). Key features: calibration check of test equipment, hold and witness points per QAP and non-conformity reports with closure tracking. Typically used for utilities and PSUs, lender quality assurance and government procurement. Delivered in line with ISO/IEC 17020, IS 2500 (Sampling Inspection) and IS 2026 (Power Transformers). Mobilisation Inspector assigned in 48 hours; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Rajatcore
Model
RAJ-6E2 series
Listing type
Service
Unit
day
Minimum order
1 day
Lead time
Inspector assigned in 48 hours
Warranty
As per contract
Standards
ISO/IEC 17020, IS 2500 (Sampling Inspection), IS 2026 (Power Transformers)
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India (imported sub-assemblies)
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Inspection effort1 man-dayRAJ-6E2-01Inspection effort: 1 man-day1 day · Inspector assigned in 48 hourson quote
Inspection effort5 man-daysRAJ-6E2-02Inspection effort: 5 man-days1 day · Inspector assigned in 48 hourson quote
Inspection effort10 man-daysRAJ-6E2-03Inspection effort: 10 man-days1 day · Inspector assigned in 48 hourson quote
Inspection effort20 man-daysRAJ-6E2-04Inspection effort: 20 man-days1 day · Inspector assigned in 48 hourson quote
Inspection effort50 man-daysRAJ-6E2-05Inspection effort: 50 man-days1 day · Report in 24-48 hourson quote
Inspection effort100 man-daysRAJ-6E2-06Inspection effort: 100 man-days1 day · Report in 24-48 hourson quote

Specifications

Inspection effort1 man-day to 100 man-days (see variants)
Equipment inspectedTransformers and reactors
Inspection stageIn-processmade to order: Raw material / Final pre-dispatch
Standards usedPer approved QAPmade to order: Per client specification
Inspector qualificationLevel II NDT certifiedmade to order: B.E. Electrical with 8 years experience
AccreditationISO/IEC 17020 body
ReportInspection release notemade to order: Detailed report with photos in 48 hours
CoveragePan Indiamade to order: Domestic and export vendors
SamplingAQL level IImade to order: As per IS 2500
Release noteDigital signaturemade to order: Hard copy plus scan
TravelIncluded in ratemade to order: At actuals

BARREL: Bharat Atom Renewable Resources Energy Limited