Catalogue / Third-party inspection (TPI)
Third-party inspection of electrical equipment at vendor works, Edge 7 seriesSample
by Rajatcore Consultants (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Rajatcore Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Edge 7 service of third-party inspection of electrical equipment at vendor works by Rajatcore covers 6 inspection effort options (1 man-day to 100 man-days). Key features: calibration check of test equipment, hold and witness points per QAP and non-conformity reports with closure tracking. Typically used for utilities and PSUs, lender quality assurance and government procurement. Delivered in line with ISO/IEC 17020, IS 2500 (Sampling Inspection) and IS 2026 (Power Transformers). Mobilisation Inspector assigned in 48 hours; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Rajatcore
- Model
- RAJ-6E2 series
- Listing type
- Service
- Unit
- day
- Minimum order
- 1 day
- Lead time
- Inspector assigned in 48 hours
- Warranty
- As per contract
- Standards
- ISO/IEC 17020, IS 2500 (Sampling Inspection), IS 2026 (Power Transformers)
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Inspection effort1 man-dayRAJ-6E2-01 | Inspection effort: 1 man-day | 1 day · Inspector assigned in 48 hours | on quote |
| Inspection effort5 man-daysRAJ-6E2-02 | Inspection effort: 5 man-days | 1 day · Inspector assigned in 48 hours | on quote |
| Inspection effort10 man-daysRAJ-6E2-03 | Inspection effort: 10 man-days | 1 day · Inspector assigned in 48 hours | on quote |
| Inspection effort20 man-daysRAJ-6E2-04 | Inspection effort: 20 man-days | 1 day · Inspector assigned in 48 hours | on quote |
| Inspection effort50 man-daysRAJ-6E2-05 | Inspection effort: 50 man-days | 1 day · Report in 24-48 hours | on quote |
| Inspection effort100 man-daysRAJ-6E2-06 | Inspection effort: 100 man-days | 1 day · Report in 24-48 hours | on quote |
Specifications
| Inspection effort | 1 man-day to 100 man-days (see variants) |
|---|---|
| Equipment inspected | Transformers and reactors |
| Inspection stage | In-processmade to order: Raw material / Final pre-dispatch |
| Standards used | Per approved QAPmade to order: Per client specification |
| Inspector qualification | Level II NDT certifiedmade to order: B.E. Electrical with 8 years experience |
| Accreditation | ISO/IEC 17020 body |
| Report | Inspection release notemade to order: Detailed report with photos in 48 hours |
| Coverage | Pan Indiamade to order: Domestic and export vendors |
| Sampling | AQL level IImade to order: As per IS 2500 |
| Release note | Digital signaturemade to order: Hard copy plus scan |
| Travel | Included in ratemade to order: At actuals |