Catalogue / Hot-gas-path parts & overhaul kits

No photo yet

Hot-gas-path inspection kit, Core seriesSample

by Ravi Gas Power Systems (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Ravi Gas Power Systems (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Hot-gas-path inspection kit from Ravi, Core series: 6 turbine class options between 5 MW and 150 MW. Key features: kits packed per inspection type, dimensional inspection to OEM drawings and fully traceable heat and lot records. Typically used for industrial gas turbine owners, gas turbine overhauls and combined cycle outages. Designed and tested to ISO 3977, ASTM B637 and AMS 5383. Lead time 20-36 weeks; delivers to West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Ravi
Model
RAV-EE4 series
Listing type
Product
Unit
set
Minimum order
2 set
Lead time
20-36 weeks
Warranty
8000 equivalent operating hours
Standards
ISO 3977, ASTM B637, AMS 5383
Delivers to
West India
GST rate
18 %
Country of origin
India
Packaging
Steel skid with shrink wrap
Delivery terms
FOR site, freight included
Returns
Replacement of items damaged in transit within 7 days
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Turbine class5 MWRAV-EE4-01Turbine class: 5 MW2 set · 20-36 weeksfor verified buyers
Turbine class15 MWRAV-EE4-02Turbine class: 15 MW2 set · 20-36 weeksfor verified buyers
Turbine class30 MWRAV-EE4-03Turbine class: 30 MW2 set · 20-36 weeksfor verified buyers
Turbine class50 MWRAV-EE4-04Turbine class: 50 MW2 set · 20-36 weeksfor verified buyers
Turbine class100 MWRAV-EE4-05Turbine class: 100 MW2 set · 20-36 weeksfor verified buyers
Turbine class150 MWRAV-EE4-06Turbine class: 150 MW2 set · 20-36 weeksfor verified buyers

Specifications

Turbine class5 MW to 150 MW (see variants)
ComponentNozzles
StageAll stagesmade to order: Stage 1 / Stage 2
Base alloyNickel superalloymade to order: Cobalt alloy
CoatingMCrAlY
CoolingFilm cooledmade to order: Impingement
OriginThird-party certifiedmade to order: OEM
RefurbishmentNewmade to order: Repaired and recoated
InspectionFluorescent penetrant, X-ray
Service interval32000 hrsmade to order: 24000 hrs
DocumentationMaterial and heat certificates

BARREL: Bharat Atom Renewable Resources Energy Limited