Catalogue / Hot-gas-path parts & overhaul kits

No photo yet

Combustor liner and transition piece set, Plus seriesSample

by Ravi Gas Power Systems (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Ravi Gas Power Systems (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Combustor liner and transition piece set from Ravi, Plus series: 5 turbine class options between 5 MW and 100 MW. Design: repair option for blades, thermal barrier coating applied and dimensional inspection to OEM drawings. Typically used for gas turbine overhauls, third-party service providers and industrial gas turbine owners. Designed and tested to ISO 3977, ASTM B637 and AMS 5383. Lead time 20-36 weeks; delivers to West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Ravi
Model
RAV-189 series
Listing type
Product
Unit
set
Minimum order
5 set
Lead time
20-36 weeks
Warranty
8000 equivalent operating hours
Standards
ISO 3977, ASTM B637, AMS 5383
Delivers to
West India
GST rate
18 %
Country of origin
India
Packaging
Corrugated box on pallet
Delivery terms
FOR nearest railhead
Returns
No returns on made-to-order items
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Turbine class5 MWRAV-189-01Turbine class: 5 MW5 set · 20-36 weeksfor verified buyers
Turbine class15 MWRAV-189-02Turbine class: 15 MW5 set · 20-36 weeksfor verified buyers
Turbine class30 MWRAV-189-03Turbine class: 30 MW5 set · 20-36 weeksfor verified buyers
Turbine class50 MWRAV-189-04Turbine class: 50 MW5 set · 20-36 weeksfor verified buyers
Turbine class100 MWRAV-189-05Turbine class: 100 MW5 set · 20-36 weeksfor verified buyers

Specifications

Turbine class5 MW to 100 MW (see variants)
ComponentOverhaul kit
StageStage 2made to order: Stage 1 / All stages
Base alloyCobalt alloymade to order: Nickel superalloy
CoatingMCrAlY
CoolingImpingement
OriginOEMmade to order: Third-party certified
RefurbishmentRepaired and recoatedmade to order: New
InspectionFluorescent penetrant, X-ray
Service interval32000 hrsmade to order: 24000 hrs
DocumentationMaterial and heat certificates

BARREL: Bharat Atom Renewable Resources Energy Limited