Gas turbine package with enclosure, Titan seriesSample
by Ravi Gas Power Systems (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Ravi Gas Power Systems (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Titan range of gas turbine package with enclosure by Ravi covers 5 ISO rating options (1 MW to 50 MW). Highlights: dry low-NOx combustion, compact package with acoustic enclosure and black start capable. Suited to industrial cogeneration, combined cycle plants and peaking power. Designed and tested to ISO 3977, API 616 and IEC 60034-1. Lead time 18-26 months; delivers to West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Ravi
- Model
- RAV-003 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 1 nos
- Lead time
- 18-26 months
- Warranty
- 24 months
- Standards
- ISO 3977, API 616, IEC 60034-1
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- As per item, transit-safe
- Delivery terms
- Ex-works, freight extra at actuals
- Returns
- Replacement of items damaged in transit within 7 days
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| ISO rating1 MWRAV-003-01 | ISO rating: 1 MW | 1 nos · 18-26 months | for verified buyers |
| ISO rating5 MWRAV-003-02 | ISO rating: 5 MW | 1 nos · 18-26 months | for verified buyers |
| ISO rating15 MWRAV-003-03 | ISO rating: 15 MW | 1 nos · 18-26 months | for verified buyers |
| ISO rating30 MWRAV-003-04 | ISO rating: 30 MW | 1 nos · 18-26 months | for verified buyers |
| ISO rating50 MWRAV-003-05 | ISO rating: 50 MW | 1 nos · 18-26 months | for verified buyers |
Specifications
| ISO rating | 1 MW to 50 MW (see variants) |
|---|---|
| Type | Industrial |
| Fuel | Natural gasmade to order: Dual fuel gas / HSD / Syngas |
| Efficiency | 27% |
| Exhaust temperature | 480 Cmade to order: 540 C / 600 C |
| Pressure ratio | 10:1 |
| NOx control | Water injectionmade to order: DLN |
| Speed | 3000 rpm |
| Starting | Static start |
| Combined cycle ready | Yes |
| Inlet filter | Multi-stage with chiller option |
| Emissions | NOx <= 25 ppm |