Catalogue / Gas turbines

No photo yet

Mid-size gas turbine for CHP, Flex seriesSample

by Ravi Gas Power Systems (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Ravi Gas Power Systems (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

The Flex range of mid-size gas turbine for CHP by Ravi covers 6 ISO rating options (5 MW to 250 MW). Design: dual-fuel operation capability, compact package with acoustic enclosure and dry low-NOx combustion. Used by industrial cogeneration, oil and gas facilities and peaking power. Designed and tested to ISO 3977, API 616 and IEC 60034-1. Lead time 12-18 months; delivers to West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Ravi
Model
RAV-1E5 series
Listing type
Product
Unit
nos
Minimum order
2 nos
Lead time
12-18 months
Warranty
24 months
Standards
ISO 3977, API 616, IEC 60034-1
Delivers to
West India
GST rate
18 %
Country of origin
India
Packaging
Steel skid with shrink wrap
Delivery terms
Ex-works, freight extra at actuals
Returns
Replacement of items damaged in transit within 7 days
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
ISO rating5 MWRAV-1E5-01ISO rating: 5 MW2 nos · 12-18 monthsfor verified buyers
ISO rating15 MWRAV-1E5-02ISO rating: 15 MW2 nos · 12-18 monthsfor verified buyers
ISO rating30 MWRAV-1E5-03ISO rating: 30 MW2 nos · 12-18 monthsfor verified buyers
ISO rating50 MWRAV-1E5-04ISO rating: 50 MW2 nos · 12-18 monthsfor verified buyers
ISO rating100 MWRAV-1E5-05ISO rating: 100 MW2 nos · 18-26 monthsfor verified buyers
ISO rating250 MWRAV-1E5-06ISO rating: 250 MW2 nos · 18-26 monthsfor verified buyers

Specifications

ISO rating5 MW to 250 MW (see variants)
TypeHeavy-duty framemade to order: Industrial / Aeroderivative
FuelNatural gas
Efficiency41%made to order: 27% / 33% / 38%
Exhaust temperature540 C
Pressure ratio10:1
NOx controlWater injectionmade to order: DLN
Speed3000 rpm
StartingDiesel start
Combined cycle readyYes
Inlet filterMulti-stage with chiller option
EmissionsNOx <= 25 ppm

BARREL: Bharat Atom Renewable Resources Energy Limited