Catalogue / Fuel cells

No photo yet

Stationary PEM fuel cell power module, Max seriesSample

by Ravi Hydrogen Systems (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Ravi Hydrogen Systems (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

The Max range of stationary PEM fuel cell power module by Ravi covers 5 rated power options (1 kW to 60 kW). Highlights: integrated DC-DC converter, hydrogen leak detection built in and remote monitoring. Typically used for data centre backup, forklifts and material handling and remote microgrids. Designed and tested to IEC 62282-3-100, IEC 62282-2 and IS 17565. Lead time 12-16 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Ravi
Model
RAV-7D1 series
Listing type
Product
Unit
nos
Minimum order
2 nos
Lead time
12-16 weeks
Warranty
24 months or 5000 hours
Standards
IEC 62282-3-100, IEC 62282-2, IS 17565
Delivers to
All India
GST rate
18 %
Country of origin
India
Packaging
Drum / reel with end caps
Delivery terms
Door delivery in metro cities
Returns
No returns on made-to-order items
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Rated power1 kWRAV-7D1-01Rated power: 1 kW2 nos · 12-16 weeksfor verified buyers
Rated power5 kWRAV-7D1-02Rated power: 5 kW2 nos · 12-16 weeksfor verified buyers
Rated power10 kWRAV-7D1-03Rated power: 10 kW2 nos · 12-16 weeksfor verified buyers
Rated power30 kWRAV-7D1-04Rated power: 30 kW2 nos · 20-28 weeksfor verified buyers
Rated power60 kWRAV-7D1-05Rated power: 60 kW2 nos · 20-28 weeksfor verified buyers

Specifications

Rated power1 kW to 60 kW (see variants)
TypeHT-PEMmade to order: PEM / SOFC
FuelReformed natural gasmade to order: Hydrogen 99.97%
Output voltage48 V DCmade to order: 400 V DC
Electrical efficiency45-55%
Start-up time< 2 hours for SOFC
Operating pressure1.5 bar
CoolingAir-cooled
Stack life20000 hours
Operating temperature700-800 deg C
Noise< 65 dB(A)
CommunicationCAN, Modbus

BARREL: Bharat Atom Renewable Resources Energy Limited