Catalogue / Engineering & design
Cable and earthing design package, Ultra 5 seriesSample
by Ravikiran Consultants (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Ravikiran Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Ultra 5 service of cable and earthing design package by Ravikiran covers 6 plant capacity options (1 MW to 100 MW). Highlights: as-built drawing update after commissioning, cable sizing and voltage drop calculations and yield and loss modelling aligned to bankable reports. Used by IPPs and developers, captive and C&I solar owners and lender technical reviews. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, IEC 62548 and IS 3043 (Earthing). Mobilisation 6-10 weeks; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Ravikiran
- Model
- RAV-AE3 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- 6-10 weeks
- Warranty
- Design correction at no cost for 12 months
- Standards
- CEA (Technical Standards for Connectivity) Regulations, IEC 62548, IS 3043 (Earthing)
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Plant capacity1 MWRAV-AE3-01 | Plant capacity: 1 MW | 1 job · 6-10 weeks | on quote |
| Plant capacity5 MWRAV-AE3-02 | Plant capacity: 5 MW | 1 job · 6-10 weeks | on quote |
| Plant capacity10 MWRAV-AE3-03 | Plant capacity: 10 MW | 1 job · 6-10 weeks | on quote |
| Plant capacity25 MWRAV-AE3-04 | Plant capacity: 25 MW | 1 job · 6-10 weeks | on quote |
| Plant capacity50 MWRAV-AE3-05 | Plant capacity: 50 MW | 1 job · 6-10 weeks | on quote |
| Plant capacity100 MWRAV-AE3-06 | Plant capacity: 100 MW | 1 job · 6-10 weeks | on quote |
Specifications
| Plant capacity | 1 MW to 100 MW (see variants) |
|---|---|
| Deliverables | Full IFC drawing set with calculations |
| Design software | PVsyst, STAAD, ETAP, Civil 3Dmade to order: PVsyst, AutoCAD, ETAP |
| Team | Electrical, civil and SCADA discipline leadsmade to order: Lead engineer plus 3 designers |
| Turnaround | 3-4 weeks |
| Revisions included | 2 rounds |
| Authority submission support | DISCOM/STU drawing approvalmade to order: CEA/CEIG drawing approval / None |
| Earthing and LA study | Optional add-on |
| Format | PDF and native CADmade to order: PDF, CAD and BIM model |
| Site visit | One visit includedmade to order: Two visits included / Desk design only |
| Payment milestones | 50% advance, 50% on deliverymade to order: 30% advance, 40% on drafts, 30% on IFC |