Catalogue / Civil & foundation works
Pile foundations for module mounting structures, Plus 7 seriesSample
by Ravikiran Consultants (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Ravikiran Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Pile foundations for module mounting structures from Ravikiran, Plus 7 series: 6 works volume options between 1 MW equivalent and 100 MW equivalent. Key features: monsoon-ready drainage planning, local labour employed where possible and daily quantity and progress log. Suited to substations and control rooms, wind farms and solar parks. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation 4-12 weeks execution; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Ravikiran
- Model
- RAV-1C7 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- 4-12 weeks execution
- Warranty
- Pile load test certified
- Standards
- IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Works volume1 MW equivalentRAV-1C7-01 | Works volume: 1 MW equivalent | 1 job · 4-12 weeks execution | for verified buyers |
| Works volume5 MW equivalentRAV-1C7-02 | Works volume: 5 MW equivalent | 1 job · 4-12 weeks execution | for verified buyers |
| Works volume10 MW equivalentRAV-1C7-03 | Works volume: 10 MW equivalent | 1 job · 4-12 weeks execution | for verified buyers |
| Works volume25 MW equivalentRAV-1C7-04 | Works volume: 25 MW equivalent | 1 job · 4-12 weeks execution | for verified buyers |
| Works volume50 MW equivalentRAV-1C7-05 | Works volume: 50 MW equivalent | 1 job · 4-12 weeks execution | for verified buyers |
| Works volume100 MW equivalentRAV-1C7-06 | Works volume: 100 MW equivalent | 1 job · 4-12 weeks execution | for verified buyers |
Specifications
| Works volume | 1 MW equivalent to 100 MW equivalent (see variants) |
|---|---|
| Foundation type | RCC bored pilemade to order: Driven steel pile / Ramming or screw pile / Raft or isolated footing |
| Concrete grade | M40 for turbine foundationmade to order: M25 / M30 |
| Pull-out testing | Random test plus lateral loadmade to order: 2% piles tested |
| Reinforcement | Fe 500D TMT |
| Roads and drainage | WBM road with culvertsmade to order: Murram road, 4 m wide / Not included |
| Boundary | Compound wall with barbed wire |
| Quality | Cube test reports per pourmade to order: NABL lab testing of materials |
| Machinery | Piling rigs and excavators |
| Duration | 4-8 weeks |
| Payment terms | Item rate with retentionmade to order: Measured running bills |