Catalogue / Civil & foundation works

No photo yet

Pile foundations for module mounting structures, Plus 7 seriesSample

by Ravikiran Consultants (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Ravikiran Consultants (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Pile foundations for module mounting structures from Ravikiran, Plus 7 series: 6 works volume options between 1 MW equivalent and 100 MW equivalent. Key features: monsoon-ready drainage planning, local labour employed where possible and daily quantity and progress log. Suited to substations and control rooms, wind farms and solar parks. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation 4-12 weeks execution; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Ravikiran
Model
RAV-1C7 series
Listing type
Service
Unit
job
Minimum order
1 job
Lead time
4-12 weeks execution
Warranty
Pile load test certified
Standards
IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
Delivers to
North India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Works volume1 MW equivalentRAV-1C7-01Works volume: 1 MW equivalent1 job · 4-12 weeks executionfor verified buyers
Works volume5 MW equivalentRAV-1C7-02Works volume: 5 MW equivalent1 job · 4-12 weeks executionfor verified buyers
Works volume10 MW equivalentRAV-1C7-03Works volume: 10 MW equivalent1 job · 4-12 weeks executionfor verified buyers
Works volume25 MW equivalentRAV-1C7-04Works volume: 25 MW equivalent1 job · 4-12 weeks executionfor verified buyers
Works volume50 MW equivalentRAV-1C7-05Works volume: 50 MW equivalent1 job · 4-12 weeks executionfor verified buyers
Works volume100 MW equivalentRAV-1C7-06Works volume: 100 MW equivalent1 job · 4-12 weeks executionfor verified buyers

Specifications

Works volume1 MW equivalent to 100 MW equivalent (see variants)
Foundation typeRCC bored pilemade to order: Driven steel pile / Ramming or screw pile / Raft or isolated footing
Concrete gradeM40 for turbine foundationmade to order: M25 / M30
Pull-out testingRandom test plus lateral loadmade to order: 2% piles tested
ReinforcementFe 500D TMT
Roads and drainageWBM road with culvertsmade to order: Murram road, 4 m wide / Not included
BoundaryCompound wall with barbed wire
QualityCube test reports per pourmade to order: NABL lab testing of materials
MachineryPiling rigs and excavators
Duration4-8 weeks
Payment termsItem rate with retentionmade to order: Measured running bills