Catalogue / Cabling, trenching & HDD works
Underground cable route survey, Volt 8 seriesSample
by Ravikiran Consultants (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Ravikiran Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Volt 8 service of underground cable route survey by Ravikiran covers 4 cable route length options (1 km to 10 km). Key features: dewatering in high water table, warning tape and marker installation and utility locating before excavation. Suited to railway and highway crossings, urban distribution upgrades and renewable plant internal networks. Delivered in line with IS 1255 (Cable Installation), IS 7098 (XLPE Cables) and IEC 60840. Mobilisation Permits may extend timeline; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Ravikiran
- Model
- RAV-3B1 series
- Listing type
- Service
- Unit
- km
- Minimum order
- 1 km
- Lead time
- Permits may extend timeline
- Warranty
- Workmanship 12 months
- Standards
- IS 1255 (Cable Installation), IS 7098 (XLPE Cables), IEC 60840
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Cable route length1 kmRAV-3B1-01 | Cable route length: 1 km | 1 km · Permits may extend timeline | for verified buyers |
| Cable route length2 kmRAV-3B1-02 | Cable route length: 2 km | 1 km · Permits may extend timeline | for verified buyers |
| Cable route length5 kmRAV-3B1-03 | Cable route length: 5 km | 1 km · Permits may extend timeline | for verified buyers |
| Cable route length10 kmRAV-3B1-04 | Cable route length: 10 km | 1 km · Permits may extend timeline | for verified buyers |
Specifications
| Cable route length | 1 km to 10 km (see variants) |
|---|---|
| Method | Open trench |
| HDD capacity | Up to 450 mm bore |
| Trench depth | 1.2 mmade to order: 0.9 m / 1.5 m |
| Cable type | LT armouredmade to order: 11/33 kV XLPE |
| Jointing | Heat shrinkmade to order: Cold shrink / Premoulded |
| Restoration | Backfill and compaction onlymade to order: Road and footpath restoration |
| Permissions | Client arranges |
| Testing | Hipot and sheath test |
| Productivity | 50 m per day HDDmade to order: 300 m per day open trench |
| Crew | HDD crew of 8 with rigmade to order: Trenching team of 15 |