Catalogue / Installation & erection
Power transformer installation and oil filling, Smart seriesSample
by Ravikiran Consultants (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Ravikiran Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Power transformer installation and oil filling from Ravikiran, Smart series: 4 installation scope options between 10 MW and 100 MW. Design: cable route marking and tray fixing, punch list closure before testing and module handling to avoid micro-cracks. Suited to hybrid projects, wind farm substations and utility solar parks. Delivered in line with IS 732 (Electrical Wiring), IEC 62548 and CEA (Measures relating to Safety) Regulations. Mobilisation Phased by block; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Ravikiran
- Model
- RAV-711 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Phased by block
- Warranty
- Defect liability 24 months
- Standards
- IS 732 (Electrical Wiring), IEC 62548, CEA (Measures relating to Safety) Regulations
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Installation scope10 MWRAV-711-01 | Installation scope: 10 MW | 1 MW · Phased by block | for verified buyers |
| Installation scope25 MWRAV-711-02 | Installation scope: 25 MW | 1 MW · Phased by block | for verified buyers |
| Installation scope50 MWRAV-711-03 | Installation scope: 50 MW | 1 MW · Phased by block | for verified buyers |
| Installation scope100 MWRAV-711-04 | Installation scope: 100 MW | 1 MW · Phased by block | for verified buyers |
Specifications
| Installation scope | 10 MW to 100 MW (see variants) |
|---|---|
| Scope | Structure and module installation |
| Manpower deployed | Peak crew of 200 |
| Supervision | Site engineer and safety officermade to order: Project manager, engineers, QA/QC |
| Equipment | Own cranes and erection tools |
| Quality plan | Client-approved ITPmade to order: ISO 9001 QAP with hold points |
| Safety | Lost-time-injury-free target, HIRAmade to order: Daily toolbox talks, PPE, permits |
| Licence | Electrical contractor licence |
| Insurance | CAR, WC and third-party liabilitymade to order: CAR and workmen compensation |
| Reporting | Weekly report with look-ahead plan |
| Payment terms | Monthly running billsmade to order: Milestone based with 10% retention |