Catalogue / Civil & foundation works
Pre-cast and cast-in-situ foundations for transformers, Core seriesSample
by Ravikiran Technical Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Ravikiran Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Core service of pre-cast and cast-in-situ foundations for transformers by Ravikiran covers 5 works volume options (1 MW equivalent to 50 MW equivalent). Design: pile layout tolerance maintained to design, daily quantity and progress log and monsoon-ready drainage planning. Suited to industrial plants, substations and control rooms and solar parks. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation 4-12 weeks execution; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Ravikiran
- Model
- RAV-479 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- 4-12 weeks execution
- Warranty
- Pile load test certified
- Standards
- IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Works volume1 MW equivalentRAV-479-01 | Works volume: 1 MW equivalent | 1 job · 4-12 weeks execution | on quote |
| Works volume5 MW equivalentRAV-479-02 | Works volume: 5 MW equivalent | 1 job · 4-12 weeks execution | on quote |
| Works volume10 MW equivalentRAV-479-03 | Works volume: 10 MW equivalent | 1 job · 4-12 weeks execution | on quote |
| Works volume25 MW equivalentRAV-479-04 | Works volume: 25 MW equivalent | 1 job · 4-12 weeks execution | on quote |
| Works volume50 MW equivalentRAV-479-05 | Works volume: 50 MW equivalent | 1 job · 4-12 weeks execution | on quote |
Specifications
| Works volume | 1 MW equivalent to 50 MW equivalent (see variants) |
|---|---|
| Foundation type | RCC bored pilemade to order: Driven steel pile / Ramming or screw pile / Raft or isolated footing |
| Concrete grade | M25 |
| Pull-out testing | Random test plus lateral loadmade to order: 2% piles tested |
| Reinforcement | Fe 550Dmade to order: Fe 500D TMT |
| Roads and drainage | Not included |
| Boundary | Chain link fence 2.4 m |
| Quality | Cube test reports per pour |
| Machinery | Piling rigs and excavators |
| Duration | 3-6 monthsmade to order: 4-8 weeks |
| Payment terms | Measured running bills |