Catalogue / Testing & commissioning
Substation commissioning with CEIG inspection, Core 3 seriesSample
by Ravikiran Technical Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Ravikiran Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Substation commissioning with CEIG inspection from Ravikiran, Core 3 series: 6 plant capacity options between 5 MW and 250 MW. Key features: commissioning certificates for lenders, test formats agreed before mobilisation and live relay setting verification. Used by EPC handover to owners, lender completion tests and repowering projects. Delivered in line with IEC 62446-1, IEC 61724-1 and CEA (Technical Standards for Connectivity) Regulations. Mobilisation 1-2 weeks on site; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Ravikiran
- Model
- RAV-B91 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- 1-2 weeks on site
- Warranty
- Retest at no cost if failure traced to test error
- Standards
- IEC 62446-1, IEC 61724-1, CEA (Technical Standards for Connectivity) Regulations
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Plant capacity5 MWRAV-B91-01 | Plant capacity: 5 MW | 1 MW · 1-2 weeks on site | on quote |
| Plant capacity10 MWRAV-B91-02 | Plant capacity: 10 MW | 1 MW · 1-2 weeks on site | on quote |
| Plant capacity25 MWRAV-B91-03 | Plant capacity: 25 MW | 1 MW · 1-2 weeks on site | on quote |
| Plant capacity50 MWRAV-B91-04 | Plant capacity: 50 MW | 1 MW · 1-2 weeks on site | on quote |
| Plant capacity100 MWRAV-B91-05 | Plant capacity: 100 MW | 1 MW · Report in 7 days | on quote |
| Plant capacity250 MWRAV-B91-06 | Plant capacity: 250 MW | 1 MW · Report in 7 days | on quote |
Specifications
| Plant capacity | 5 MW to 250 MW (see variants) |
|---|---|
| Tests covered | Full plant functional and PR testmade to order: String IV curve, insulation, earth / Transformer, switchgear, relay tests |
| Instruments | Relay test set, thermal cameramade to order: Calibrated IV tracer, megger, CRM |
| Calibration | Calibration valid at test date |
| Team | Lead plus 5 member crew |
| Statutory support | DISCOM charging support |
| Reports | Commissioning dossier with as-built |
| Duration on site | 5-7 daysmade to order: 10-14 days / 3-4 weeks |
| Performance guarantee test | Capacity and PR test per contract |
| Grid code checks | Not included |
| Payment | 50% on start, 50% on report |