Catalogue / Testing & commissioning

No photo yet

Substation commissioning with CEIG inspection, Core 3 seriesSample

by Ravikiran Technical Services (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Ravikiran Technical Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Substation commissioning with CEIG inspection from Ravikiran, Core 3 series: 6 plant capacity options between 5 MW and 250 MW. Key features: commissioning certificates for lenders, test formats agreed before mobilisation and live relay setting verification. Used by EPC handover to owners, lender completion tests and repowering projects. Delivered in line with IEC 62446-1, IEC 61724-1 and CEA (Technical Standards for Connectivity) Regulations. Mobilisation 1-2 weeks on site; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Ravikiran
Model
RAV-B91 series
Listing type
Service
Unit
MW
Minimum order
1 MW
Lead time
1-2 weeks on site
Warranty
Retest at no cost if failure traced to test error
Standards
IEC 62446-1, IEC 61724-1, CEA (Technical Standards for Connectivity) Regulations
Delivers to
All India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Plant capacity5 MWRAV-B91-01Plant capacity: 5 MW1 MW · 1-2 weeks on siteon quote
Plant capacity10 MWRAV-B91-02Plant capacity: 10 MW1 MW · 1-2 weeks on siteon quote
Plant capacity25 MWRAV-B91-03Plant capacity: 25 MW1 MW · 1-2 weeks on siteon quote
Plant capacity50 MWRAV-B91-04Plant capacity: 50 MW1 MW · 1-2 weeks on siteon quote
Plant capacity100 MWRAV-B91-05Plant capacity: 100 MW1 MW · Report in 7 dayson quote
Plant capacity250 MWRAV-B91-06Plant capacity: 250 MW1 MW · Report in 7 dayson quote

Specifications

Plant capacity5 MW to 250 MW (see variants)
Tests coveredFull plant functional and PR testmade to order: String IV curve, insulation, earth / Transformer, switchgear, relay tests
InstrumentsRelay test set, thermal cameramade to order: Calibrated IV tracer, megger, CRM
CalibrationCalibration valid at test date
TeamLead plus 5 member crew
Statutory supportDISCOM charging support
ReportsCommissioning dossier with as-built
Duration on site5-7 daysmade to order: 10-14 days / 3-4 weeks
Performance guarantee testCapacity and PR test per contract
Grid code checksNot included
Payment50% on start, 50% on report

BARREL: Bharat Atom Renewable Resources Energy Limited