Catalogue / Installation & erection
Turbine tower and nacelle erection support, Max 4 seriesSample
by Ravikiran Technical Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Ravikiran Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Ravikiran Max 4 turbine tower and nacelle erection support, offered in 6 installation scope options from 1 MW to 100 MW. Design: cable route marking and tray fixing, punch list closure before testing and mobile team available for remote sites. Typically used for utility solar parks, wind farm substations and hybrid projects. Delivered in line with IS 732 (Electrical Wiring), IEC 62548 and CEA (Measures relating to Safety) Regulations. Mobilisation Start after material at site; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Ravikiran
- Model
- RAV-C42 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Start after material at site
- Warranty
- Defect liability 24 months
- Standards
- IS 732 (Electrical Wiring), IEC 62548, CEA (Measures relating to Safety) Regulations
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Installation scope1 MWRAV-C42-01 | Installation scope: 1 MW | 1 MW · Start after material at site | on quote |
| Installation scope5 MWRAV-C42-02 | Installation scope: 5 MW | 1 MW · Start after material at site | on quote |
| Installation scope10 MWRAV-C42-03 | Installation scope: 10 MW | 1 MW · Start after material at site | on quote |
| Installation scope25 MWRAV-C42-04 | Installation scope: 25 MW | 1 MW · Start after material at site | on quote |
| Installation scope50 MWRAV-C42-05 | Installation scope: 50 MW | 1 MW · Phased by block | on quote |
| Installation scope100 MWRAV-C42-06 | Installation scope: 100 MW | 1 MW · Phased by block | on quote |
Specifications
| Installation scope | 1 MW to 100 MW (see variants) |
|---|---|
| Scope | Electrical BoP erection |
| Manpower deployed | 25 technicians per MW-blockmade to order: 60 technicians plus supervisors / Peak crew of 200 |
| Supervision | Site engineer and safety officer |
| Equipment | Own cranes and erection tools |
| Quality plan | ISO 9001 QAP with hold points |
| Safety | Daily toolbox talks, PPE, permits |
| Licence | Electrical contractor licence |
| Insurance | CAR and workmen compensationmade to order: CAR, WC and third-party liability |
| Reporting | Weekly report with look-ahead plan |
| Payment terms | Monthly running bills |