Catalogue / Engineering & design
Cable and earthing design package, Smart seriesSample
by Ravikiran Technical Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Ravikiran Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Smart service of cable and earthing design package by Ravikiran covers 6 plant capacity options (5 MW to 250 MW). Highlights: yield and loss modelling aligned to bankable reports, as-built drawing update after commissioning and compliant with state grid code requirements. Used by captive and C&I solar owners, lender technical reviews and EPC contractors bidding for projects. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, IEC 62548 and IS 3043 (Earthing). Mobilisation 6-10 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Ravikiran
- Model
- RAV-AE1 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- 6-10 weeks
- Warranty
- As per contract
- Standards
- CEA (Technical Standards for Connectivity) Regulations, IEC 62548, IS 3043 (Earthing)
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Plant capacity5 MWRAV-AE1-01 | Plant capacity: 5 MW | 1 job · 6-10 weeks | on quote |
| Plant capacity10 MWRAV-AE1-02 | Plant capacity: 10 MW | 1 job · 6-10 weeks | on quote |
| Plant capacity25 MWRAV-AE1-03 | Plant capacity: 25 MW | 1 job · 6-10 weeks | on quote |
| Plant capacity50 MWRAV-AE1-04 | Plant capacity: 50 MW | 1 job · 6-10 weeks | on quote |
| Plant capacity100 MWRAV-AE1-05 | Plant capacity: 100 MW | 1 job · 6-10 weeks | on quote |
| Plant capacity250 MWRAV-AE1-06 | Plant capacity: 250 MW | 1 job · 6-10 weeks | on quote |
Specifications
| Plant capacity | 5 MW to 250 MW (see variants) |
|---|---|
| Deliverables | GA drawings, SLD, BoQmade to order: Full IFC drawing set with calculations / Design basis report plus drawings |
| Design software | PVsyst, AutoCAD, ETAP |
| Team | Lead engineer plus 3 designers |
| Turnaround | 6-8 weeksmade to order: 3-4 weeks / 10-12 weeks |
| Revisions included | 3 rounds |
| Authority submission support | DISCOM/STU drawing approval |
| Earthing and LA study | Includedmade to order: Optional add-on |
| Format | PDF, CAD and BIM model |
| Site visit | Two visits included |
| Payment milestones | 50% advance, 50% on delivery |