Catalogue / Demand response

No photo yet

Demand response programme enrolment, Pro seriesSample

by Ravinandi Advisory (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Ravinandi Advisory (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Demand response programme enrolment from Ravinandi, Pro series: 3 curtailable load options between 5 MW and 25 MW. Highlights: support for grid operators, settlement transparency and integration with plant process limits. Suited to DISCOMs needing peak relief, commercial buildings and industrial plants with flexible load. Delivered in line with CERC DR Guidelines, State TOD Tariff Orders and OpenADR 2.0b. Mobilisation Assessment in 2-3 weeks; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Ravinandi
Model
RAV-B86 series
Listing type
Service
Unit
MW
Minimum order
1 MW
Lead time
Assessment in 2-3 weeks
Warranty
As per programme terms
Standards
CERC DR Guidelines, State TOD Tariff Orders, OpenADR 2.0b
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Curtailable load5 MWRAV-B86-01Curtailable load: 5 MW1 MW · Assessment in 2-3 weekson quote
Curtailable load10 MWRAV-B86-02Curtailable load: 10 MW1 MW · Assessment in 2-3 weekson quote
Curtailable load25 MWRAV-B86-03Curtailable load: 25 MW1 MW · Assessment in 2-3 weekson quote

Specifications

Curtailable load5 MW to 25 MW (see variants)
ProgrammeTOD optimisationmade to order: Utility DR / Aggregator DR
ControlManualmade to order: Automated through SCADA
Notice2 hours
Duration per event1 hour
Events per year20made to order: 50 / Unlimited
MeteringDedicated interval meter
Incentive sharing70:30 customer:aggregator
Baseline methodRegressionmade to order: 10-day average
ReportingMonthly savingsmade to order: Event report
Contract term1 yearmade to order: 3 years

BARREL: Bharat Atom Renewable Resources Energy Limited