Demand response programme enrolment, Smart seriesSample
by Ravinandi Advisory (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Ravinandi Advisory (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Ravinandi Smart demand response programme enrolment, offered in 3 curtailable load options from 5 MW to 25 MW. Key features: settlement transparency, support for grid operators and integration with plant process limits. Suited to DISCOMs needing peak relief, commercial buildings and cold storage and water pumping. Delivered in line with CERC DR Guidelines, State TOD Tariff Orders and OpenADR 2.0b. Mobilisation Assessment in 2-3 weeks; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Ravinandi
- Model
- RAV-B83 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Assessment in 2-3 weeks
- Warranty
- Performance reporting
- Standards
- CERC DR Guidelines, State TOD Tariff Orders, OpenADR 2.0b
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Curtailable load5 MWRAV-B83-01 | Curtailable load: 5 MW | 1 MW · Assessment in 2-3 weeks | for verified buyers |
| Curtailable load10 MWRAV-B83-02 | Curtailable load: 10 MW | 1 MW · Assessment in 2-3 weeks | for verified buyers |
| Curtailable load25 MWRAV-B83-03 | Curtailable load: 25 MW | 1 MW · Assessment in 2-3 weeks | for verified buyers |
Specifications
| Curtailable load | 5 MW to 25 MW (see variants) |
|---|---|
| Programme | TOD optimisationmade to order: Utility DR / Aggregator DR |
| Control | Manualmade to order: Automated through SCADA |
| Notice | 2 hours |
| Duration per event | 1 hourmade to order: 4 hours |
| Events per year | 50 |
| Metering | Dedicated interval meter |
| Incentive sharing | 80:20 |
| Baseline method | Regressionmade to order: 10-day average |
| Reporting | Monthly savings |
| Contract term | 1 yearmade to order: 3 years |