Electrical load and power quality audit, Pro seriesSample
by Ravinandi Advisory (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Ravinandi Advisory (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Electrical load and power quality audit from Ravinandi, Pro series: 3 connected load options between 1 MW and 10 MW. Design: statutory forms and BEE reporting, verification after implementation and savings quantified with measured data. Used by PAT designated consumers, commercial buildings and hospitals and hotels. Delivered in line with Energy Conservation Act 2001, BEE Energy Auditor Regulations and IS 14160. Mobilisation Report in 2-4 weeks; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Ravinandi
- Model
- RAV-9B8 series
- Listing type
- Service
- Unit
- site
- Minimum order
- 1 site
- Lead time
- Report in 2-4 weeks
- Warranty
- Savings estimate accuracy within agreed band
- Standards
- Energy Conservation Act 2001, BEE Energy Auditor Regulations, IS 14160
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Connected load1 MWRAV-9B8-01 | Connected load: 1 MW | 1 site · Report in 2-4 weeks | for verified buyers |
| Connected load5 MWRAV-9B8-02 | Connected load: 5 MW | 1 site · Report in 2-4 weeks | for verified buyers |
| Connected load10 MWRAV-9B8-03 | Connected load: 10 MW | 1 site · Report in 2-4 weeks | for verified buyers |
Specifications
| Connected load | 1 MW to 10 MW (see variants) |
|---|---|
| Audit level | Investment-grade auditmade to order: Walk-through / Detailed audit |
| Instruments | Power analyser, thermal cameramade to order: Ultrasonic flow meter, lux meter |
| Auditor | BEE accredited energy auditor |
| Report | Implementation roadmapmade to order: Savings opportunities with payback |
| Baseline | 12-month bills analysis |
| Measurement duration | 7 daysmade to order: 3 days / 14 days |
| Coverage | Utilities |
| Statutory | Form-1 and Form-2 filing |
| Deliverable | Report and presentationmade to order: Report and monitoring plan |
| Follow-up | Not included |