Catalogue / Grid connectivity & GNA applications
Stage-II connectivity and bank guarantee support, Elite 9 seriesSample
by Ravinandi Consultants (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Ravinandi Consultants (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Elite 9 service of stage-II connectivity and bank guarantee support by Ravinandi covers 5 capacity applied options (10 MW to 500 MW). Design: handling of CTU queries, preparation of mandatory technical details and eligibility check before filing. Typically used for green hydrogen projects, renewable developers and industrial captive generators. Delivered in line with CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations and Indian Electricity Grid Code. Mobilisation Filing in 1-2 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Ravinandi
- Model
- RAV-372 series
- Listing type
- Service
- Unit
- application
- Minimum order
- 1 application
- Lead time
- Filing in 1-2 weeks
- Warranty
- As per contract
- Standards
- CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Capacity applied10 MWRAV-372-01 | Capacity applied: 10 MW | 1 application · Filing in 1-2 weeks | on quote |
| Capacity applied50 MWRAV-372-02 | Capacity applied: 50 MW | 1 application · Filing in 1-2 weeks | on quote |
| Capacity applied100 MWRAV-372-03 | Capacity applied: 100 MW | 1 application · Filing in 1-2 weeks | on quote |
| Capacity applied250 MWRAV-372-04 | Capacity applied: 250 MW | 1 application · Grant 3-9 months | on quote |
| Capacity applied500 MWRAV-372-05 | Capacity applied: 500 MW | 1 application · Grant 3-9 months | on quote |
Specifications
| Capacity applied | 10 MW to 500 MW (see variants) |
|---|---|
| Application | Both |
| Scope | Document preparation and filing |
| Bank guarantee | Arranged through partner bank |
| Studies | Grid impact summary |
| Portal handling | STU portalmade to order: CTUIL portal |
| Team | Regulatory lead and engineer |
| Timeline | Approval 3-6 months |
| Technical documents | Switchyard layout and GA drawingsmade to order: SLD, land proof, board resolution |
| Queries | Responded within 2 daysmade to order: Until grant |
| Fee basis | Fixed plus successmade to order: Fixed |